1 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 Status report SOLEIL September 2007
2
2 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 Accelerator status Accelerator is now in routine operation Beam is now mainly produced for beamlines There is only 2 day/week for Machine tests since last spring We also have to face short periods of time (about 1 week) for maintenance between runs
3
3 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 274h 40; 55% 11h 57; 2% 178h 08; 36% 33h 41; 7% Machine Physics Machine+BL time Beamline RadioProtection Beam statistics during July Run
4
4 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 BEAMLINES; 02h 28 UTILITIES; 02h 00 OTHER; 01h 59 VACCUUM; 03h 14 LINAC; 00h 18 ID; 00h 21 PS; 00:41 RF; 00:55 RF PSupplies LINAC Insertions Vaccuum Beamlines UTILITIES OTHER Statistics of failures during July Run Tango is not in the statistics !!
5
5 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 Accelerator status : Control facts Software development are still significant for : Insertions devices installation and commissioning Slow and feedforward feedbacks Major Machine operation requests are focused on : Enhancements and bug fixes on DeviceServers, ATK, Archiving systems, starter, statical database, global supervision of Control system Remote access a few applications (MAMBO for instance) through WEB interfaces New Linux Servers have to be installed to support the increase of monitoring applications (trends,alarms,etc.)
6
6 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 Accelerators : next steps Recovery procedures are to be written for many systems Architecture for Oracle Database must be extended for HDB and TDB new requirements More attributes to be stored Extension of retention period of attributes for TDB New diagnostics, insertions, and operation tools are still to be developped
7
7 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 Tango facts Last meeting, in March Now in september
8
8 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 Beamlines status 10 beamlines are now beeing commissioned DIFFABS TEMPO ODE SAMBA DESIRS CASSIOPEE PROXIMA SWING SMIS MARS First beam on the MARS beamline
9
9 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 Tango facts on beamlines SWING beamline PROXIMA beamline 12 Tango Control System in operation More than 3000 devices
10
10 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 Next steps on beamlines On the major part of the beamlines software installation (i.e DeviceServers, java applications) for « Expert Users » is almost finished First sequence acquisitions have been done We are now preparing the « Regular operation phase » : GUI acquisition application development High level process DeviceServers development Still a difficult period