1 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 Status report SOLEIL September 2007.

Similar presentations


Presentation on theme: "1 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 Status report SOLEIL September 2007."— Presentation transcript:

1 1 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 Status report SOLEIL September 2007

2 2 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 Accelerator status Accelerator is now in routine operation Beam is now mainly produced for beamlines There is only 2 day/week for Machine tests since last spring We also have to face short periods of time (about 1 week) for maintenance between runs

3 3 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005  274h 40; 55%  11h 57; 2%  178h 08; 36%  33h 41; 7% Machine Physics Machine+BL time Beamline RadioProtection Beam statistics during July Run

4 4 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 BEAMLINES; 02h 28 UTILITIES; 02h 00 OTHER; 01h 59 VACCUUM; 03h 14 LINAC; 00h 18 ID; 00h 21 PS; 00:41 RF; 00:55 RF PSupplies LINAC Insertions Vaccuum Beamlines UTILITIES OTHER Statistics of failures during July Run Tango is not in the statistics !!

5 5 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 Accelerator status : Control facts Software development are still significant for : Insertions devices installation and commissioning Slow and feedforward feedbacks Major Machine operation requests are focused on : Enhancements and bug fixes on DeviceServers, ATK, Archiving systems, starter, statical database, global supervision of Control system Remote access a few applications (MAMBO for instance) through WEB interfaces New Linux Servers have to be installed to support the increase of monitoring applications (trends,alarms,etc.)

6 6 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 Accelerators : next steps  Recovery procedures are to be written for many systems  Architecture for Oracle Database must be extended for HDB and TDB new requirements  More attributes to be stored  Extension of retention period of attributes for TDB  New diagnostics, insertions, and operation tools are still to be developped

7 7 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 Tango facts Last meeting, in March Now in september

8 8 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 Beamlines status  10 beamlines are now beeing commissioned DIFFABS TEMPO ODE SAMBA DESIRS CASSIOPEE PROXIMA SWING SMIS MARS First beam on the MARS beamline

9 9 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 Tango facts on beamlines SWING beamline PROXIMA beamline 12 Tango Control System in operation More than 3000 devices

10 10 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 Next steps on beamlines  On the major part of the beamlines software installation (i.e DeviceServers, java applications) for « Expert Users » is almost finished First sequence acquisitions have been done We are now preparing the « Regular operation phase » :  GUI acquisition application development  High level process DeviceServers development  Still a difficult period


Download ppt "1 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 Status report SOLEIL September 2007."