Presentation is loading. Please wait.

Presentation is loading. Please wait.

Closing Report IEEE 802.21 Media Independent Handover Services Session #23 Atlanta, Georgia Vivek Gupta

Similar presentations


Presentation on theme: "Closing Report IEEE 802.21 Media Independent Handover Services Session #23 Atlanta, Georgia Vivek Gupta"— Presentation transcript:

1 Closing Report IEEE 802.21 Media Independent Handover Services Session #23 Atlanta, Georgia Vivek Gupta vivek.g.gupta@intel.com

2 2 Agenda Accomplishments Comment Resolution Update Teleconference update Study Group Updates Future Locations

3 3 Accomplishments Resolved all comments in Sponsor Ballot Updated Draft D8.0 to be produced by Editor SB Recirculation to be initiated before Dec-15 Study Group Extensions approved by 802 EC Security Study Group Multi-Radio Power Conservation Management SG WG Approved ad hoc meeting in February 2008

4 4 Revised 802.21 Timeline (July 2007) IEEE 802.21 ECSG formed – March 2003 IEEE 802.21 WG formed – March 2004 Requirements development – September 2004 Call for Proposals – October 2004 Harmonized Single Proposal Confirmed by the WG – May 2005 Ongoing WG Comment Resolution started – July 2005 WG Comment Resolution completed – January 2006 Start of WG Letter Ballot – March 2006 Start of IEEE 802 Sponsor Ballot –(July-07) IEEE 802 Draft Standard sent to RevCom – March 2008 Ongoing Interaction with Other Standards Organization (3GPP, 3GPP2, IETF, 802.11, 802.16, 802.3) - adoption of it depends on the timeline of work items within these groups

5 5 SB Comment Resolution Progress SectionStart #End #Resolved #Total Comments 1-41106 51071814074 618227391 7274424150 842550883 Annex509648139 Total: 650 Comments Includes Editorials (Total: 127) Many Duplicate comments ~100

6 6 Teleconferences Dec 13: 9 AM EST: MRPM SG Dec-18 : 9 AM EST: Security SG SB Comments: Jan 8: 9 AM EST

7 7 Study Group Reports

8 8 Security SG - Accomplishments Two meeting slots: Nov. 17 (Mon) AM2, Nov. 15 (Thu) PM2 4 TR (Technical Report) contributions All contributions address Security Signaling Optimization during Handover (SSOH) One contribution also addresses MIH-level Security Mechanism (MIHS) One contribution for performance evaluation on SSOH One contribution for combining security signaling and QoS resource reservation Discussed PAR and 5C issues There will be 2 nd call for TR contributions before Jan-08 meeting Details available at http://www.ieee802.org/21/doctree/Security_SG/21-07-0446-00-0000- Securty_SG_Report.ppt http://www.ieee802.org/21/doctree/Security_SG/21-07-0446-00-0000- Securty_SG_Report.ppt

9 9 Security SG Milestones November 2007 All contributions intended to be included in the TR need to be submitted before the meeting Detailed submission guidelines will be posted to the reflector PAR/5C discussion January 2008 All major studies are expected to be done PAR/5C discussion February 2008 Submit PAR/5C to IEEE 802 EC to create a TG March 2008 Completion of TR Discuss feedback on PAR/5C Joint Meeting with 802.1 Link Security Task Group

10 10 Multi-Radio PM SG – Accomplishments Two meeting slots: Nov. 13 (Tue) AM1, Nov. 15 (Thu) PM1 Officers Chair: Behcet Sarikaya Editor: Behcet Sarikaya Secretary: Junghoon Jee Technical contributions http://www.ieee802.org/21/doctree/Multi-Radio_PM_SG/ Policy issues: policy engine at the paging controller on when to page the mobile, etc. Measurements on various platforms on sleep/idle mode, powered off states and returning back to idle state WiMAX chips sets, Cellular chip sets Draft 5C Detailed Report available at http://www.ieee802.org/21/doctree/Multi-Radio_PM_SG/21- 07-0477-00-0000-MRPM_SG_ClosingReport.ppt http://www.ieee802.org/21/doctree/Multi-Radio_PM_SG/21- 07-0477-00-0000-MRPM_SG_ClosingReport.ppt

11 11 Multi-Radio PM SG – Timeline Next steps Teleconference in December Thu. Dec. 13, details to be announced January 2008 All major studies are expected to be done PAR/5C discussion and approval at the Interim February 2008 Submit PAR/5C to IEEE 802 EC to create a TG by Feb. 14, 2008 March 2008 Completion of TR Approval of PAR/5C by EC PAR Submission to IEEE-SA Standards Board

12 12 Future Sessions

13 13 Future Sessions - 2008 Interim: Jan 13 th – 18 th, 2008 (Taipei, Howard Plaza Hotel ) Meeting co-located with all 802 groups Plenary: March 16 th – 21st,2008, Orlando, Florida Co-located with all 802 groups Interim: May 11 th – 16 th, 2008 (Jacksonville) Meeting co-located with 802.11/15/18/19/20/22 Plenary: July 13 th – 18 th,2008, Denver, Colorado Co-located with all 802 groups Interim: Sept 7 th – 12 th,2008, (Big Island, Hawaii) Meeting co-located with 802.11/15/18/19/20/22 Plenary: Nov 9 th – 14 th,2008, D allas, TX Co-located with all 802 groups

14 14 Future Sessions - 2009 Interim: Jan ???? Meeting co-located with 802.11/15/18/19/20/22 Plenary: March Rome/Vancouver??? Co-located with all 802 groups Interim: May ???? Meeting co-located with 802.11/15/18/19/20/22 Plenary: July ???? Co-located with all 802 groups Interim: Sept ???? Meeting co-located with 802.11/15/18/19/20/22 Plenary: Nov ???? Co-located with all 802 groups


Download ppt "Closing Report IEEE 802.21 Media Independent Handover Services Session #23 Atlanta, Georgia Vivek Gupta"

Similar presentations


Ads by Google