Download presentation
Presentation is loading. Please wait.
Published byJulius Adams Modified over 9 years ago
1
Aspendale Mountain Retreat Center Cabins
2
Aspendale Cabins Group Nadia Caraveo Rick Macias Mariel Reyes Danniel Rodriguez Lily Salas Manny Valenzuela Mentor: Dr. Walton
3
Topics to be Discussed Project: Phases & Project Schedule Designs to be used Handicap Accessible Environmental & Winterized Things to Come
4
Project and Project Schedule Phase 1 –Designs to be used –One being Handicap Accessible –Materials Insulation Appliances Phase 2 –Environmental Passive Solar Appliances Materials from area –Cost of entire project
5
Designs to be Used http://logcabininmichigan.blogspot.com/2008/09/floor-plan-choices.html http://www.conestogalogcabins.com/pages/products/26x39/26x39.html?gclid=CMHknpbIjqoCFcfD7Qod_13lww#plan http://www.familyhomeplans.com/plan_details.cfm?PlanNumber=94308&src=search
6
Handicap Design http://www.ada.gov/regs2010/2010ADAStandards/2010ADAStandards.pdf http://www.loghome.com/ecofriendly-california-cabin-photos/articles/3324 2010 Standards for Accessible Design March 15, 2012 1. Accessible Entrance 2. Accessible Area 3. Restroom 4. Telephone
7
Environmental Cooling –Air vents for summer –Windows Heating –Passive Solar –Wood Stove Rainwater Harvest –To be used to water
8
Winterized Winterizing –Shut down of cabins Appliances –Energy Efficient Water Heater –Energy Efficient Propane Heater –Piping http://www.houseneeds.com/shop/atop/productdirectventheaters.asp
9
Things to come… Professional Survey Design Spring/Pond for Elks Actually Completed Project Design More Appliances and Insulation Materials Cost
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.