Download presentation
Presentation is loading. Please wait.
Published byKellie Caren Griffin Modified over 8 years ago
1
TargetProcess - AGILE Project tracking tool Shashwat Gupta CS6359.002
2
Basic Structure - User
3
Basic Structure - Project
4
The Concept – Software organization
5
TargetProcess – Project Creation Enter project name Select color code Add team members Select process type Create project
6
TargetProcess – Creating a Release Release Name Start Date End Date
7
TargetProcess – Creating a Sprint Sprint Name Release Association Start Date Sprint duration in days
8
TargetProcess – Feature Creation Enter feature
9
TargetProcess – Inside a Feature Add user stories Story Status Feature Type Feature Points User Stories Points
10
TargetProcess – Inside a User Story Add tasks Task Status Story Sprint Story Release Created tasks Story Type
11
TargetProcess – Feature/Story/Task Status
12
TargetProcess – Report Generation
13
TargetProcess – Eclipse Integration ▪ Download TargetProcess Mylyn Connector from: http://www.targetprocess.com/Product/Download.aspx. Install the package into eclipse. http://www.targetprocess.com/Product/Download.aspx ▪ Then click Add Task Repository button on the Task Repositories panel and select TargetProcess connector in the list. The form to provide connection settings appears. ▪ Details at http://www.targetprocess.com/download/tp20/TargetProcess%20Eclipse% 20Mylyn%20Connector%20Guide.pdf
14
TargetProcess – Eclipse Integration
15
Thank you
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.