Download presentation
Presentation is loading. Please wait.
Published byJasper Gilbert Modified over 9 years ago
1
ACHIEVING PHILADELPHIA’S VISION ZERO ACTION PLAN THROUGH INNOVATIVE STREET DESIGN Jackson Wandres, RLA – The RBA Group December 3, 2015
2
NYCDOT Pedestrian Projects Examples – Curbs and Sidewalks
3
NYCDOT Pedestrian Projects Examples – Striping, Paint, Etc.
4
NYCDOT Pedestrian Projects Examples – Slow Zones
5
Short-term projects We’ve gotten very good at these… Chelsea Plaza
6
Short-term projects Pearl Street Plaza, DUMBO
7
Short-term projects Madison Square
8
Short-term projects Grand Army Plaza
9
NYCDOT Pedestrian Projects Examples – Full closure BROADWAY
10
NYCDOT Pedestrian Projects Examples – Full closure
11
On-Street Bike Facilities - Sharrows
12
On-Street Bike Facilities - Wide Parking Lane
13
On-Street Bike Facilities - Class 2 Bike Lane Next to Parking w/ Bike Box
14
On-Street Bike Facilities - Class 2 Green Buffered Bike Lane @ Curb
15
On-Street Bike Facilities: Allen Street Bike Lanes, Manhattan- Then and Now On-Street Bike Facilities - Class 2 Green Bufered Bike Lane @ Median
16
Off-Street Bike Facilities - Class 1 Median Bike Lanes
17
On-Street Bicycle Facilities - Raised Cycle-Track @ Median
18
On-Street Bike Facilities – 2-Way Bikeway Between Pkg and Travel Lane
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.