Philip Burrows MDI Panel Meeting 15/08/06 Philip Burrows John Adams Institute Oxford University SiD and IR/MDI Issues
2
Philip Burrows MDI Panel Meeting 15/08/06 Response to BDS CCB request SiD Advisory Group met 14/8/06 to consider BDS request IR crossing angles: 2/20 -> 14/14 mrad: support with enthusiasm -- downstream monitoring of energy and polarisation -- control of backgrounds with anti-DID -- small loss of acceptance for (some) SUSY searches Single IR hall at z=0 shared by both detectors: acceptable -- concerns about mechanical interferences between detectors: vibrational coupling, esp. during installation, repairs, upgrades -- would like to understand better single IR hall layout + size, access/installation issues (eg. shafts, shielding walls) …
3
Philip Burrows MDI Panel Meeting 15/08/06 IR hall issues: underground assembly Current baseline hall for single IR costed by CFS: 72m (x) 32m (z) 35m (y) accommodates SiD comfortably SiD DoD specifies hall: 48m (x) 28m (z) 30m (y) assuming assembly underground (18m in z may be acceptable) If CCB approves single IR hall for 2 detectors would like to understand CFS model in new paradigm
4
Philip Burrows MDI Panel Meeting 15/08/06 SiD closed, on beamline, in 20m x 28m area 3.0 m Foot Mobile PAC1 Fixed PAC2 5.105 m Pit Wall Tunnel Shield Wall Door Barrel
5
Philip Burrows MDI Panel Meeting 15/08/06 SiD open, on beamline, in 20m x 28m area 3.00 m 2.775 m3.120 m 3.20 m 1.905 m 3.00 m 6.45 m 0.55 m
6
Philip Burrows MDI Panel Meeting 15/08/06 Underground assembly space 5.00 m 6.45 m 3.00 m 4.00 m 5.00 m Barrel Yoke rotated HCAL rotated Shield Wall (beam comm. only)
7
Philip Burrows MDI Panel Meeting 15/08/06 Elevation View Hall height: 30m ? –1.000 Barrel-floor –12.90 Detector diameter –12.90 Free space above detector –3.000 Crane bridge and hook NB need to know elevation of beamline rel. to floor (CFS assumes 8.6m, above assumes 7.5m)
8
Philip Burrows MDI Panel Meeting 15/08/06 Surface assembly model (1) No objection in principle to surface assembly Like to understand implications for cost savings, schedule, ‘CMS model’ … Given it some initial consideration (MIB 1/8/06) No detailed plan yet for assembly procedures -> size of surface hall or underground IR hall; happy to consider
9
Philip Burrows MDI Panel Meeting 15/08/06 Surface assembly model (2) Some initial considerations: surface crane capacity: barrel iron 2-3000T / n segments (8<n<16) coil package: c. 600T Hcal: c. 400T complete endcap door: c. 2000T / 6 pieces 1000T crane capacity may be OK shaft diameter: 9m may be OK 2-3 years of IR hall access needed for final assembly
10
Philip Burrows MDI Panel Meeting 15/08/06 Summary SiD supports BDS request for 14/14 mrad Xing with single IR hall at z=0: like to understand CFS IR hall model in this case SiD has no objection to concept of surface assembly: like to understand implications for cost savings, schedule, learn more about ‘CMS model’ Suggestion (for discussion) that respective hall + shaft costs be assigned to each detector concept rather than machine