Download presentation
Presentation is loading. Please wait.
Published byHarry Armstrong Modified over 9 years ago
1
2012-11-30 Yoyo
2
383 639 642 633 632 376 639 642 633 376 632 639 642 633 632 376 383 341 30 60 90 120 40 points 38 points M2 Amp. 383
3
373 341 376 650 651 M2 Phase 376 341 40 points 38 points 639 642 633 376 632 341 373
4
642 639 633 639 642 633 632 S2 Amp. 40 points 38 points 383 341
5
376 650 651 S2 Phase 328 642 376 40 points 38 points 642 328 376 642
6
K1 Amp. 40 points 38 points 699 337
7
650 651 K1 Phase 40 points 38 points 337 699 638 636 650 651 636 638 637 381 STGModelF’s ObsF’s Model 637345.25321.1671(-85)62 63814.55333.5096(-82)80 6369.97351.0596(-86)85 650139.46355.1310392 651139.32358.8611096
8
O1 Amp. 40 points 38 points 636 650 637 651 337 699 338 340 379 381 383 387 388 635 636 637 641 650 651
9
TGModelFang’s ObsFang‘s model 6410.2330.3810.260.27 3380.2500.422N0.31(HK) 6350.3020.4760.36 6360.8701.1330.960.95 6370.5630.7430.620.60 6500.6200.8770.880.8 6510.3010.5540.270.37 3810.2390.4120.27 3830.4910.6290.460.42 6990.2990.489N0.30 3370.2470.489N0.30 3870.3320.512N0.32 3880.2910.4500.300.31 3790.2240.365NN 3400.1380.2660.150.17
10
O1 Phase 40 points 38 points 650 651
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.