Download presentation
Presentation is loading. Please wait.
Published byEdward Johnathan Dalton Modified over 9 years ago
1
Copyright Reserved GreenTech Malaysia 1 Project Brief/Summary The LCCF project was initiated to encourage green townships and support the government policy in reducing 40% of carbon emission per GDP per capita by the year 2020 (baseline 2005). The framework and assessment system was launched in September 2011. Objectives To develop and recognize at least five (5) cities certified as Low Carbon City or Green City in Malaysia by the year 2014. Project Fund: RM 1,814,554 Duration: 1 Jan 2013 – 31 Dec 2013 Expected Outcomes Baseline Study for 4 Pilot Projects to be completed with provisional certificate 3 Advance Training sessions completed BCiS Phase 2 completed 1 Train the Trainers session completed 2 Roadshows conducted 4 Energy & Water Consumption Reduction Training Conducted Status Data collection and analysis in progress at all 4 pilot sites (50% completed) 1 Advance Training session completed BCiS Phase 2 55% completed. Training session planned in Q4 1 roadshow conducted 2 Energy & Water Consumption Reduction Training Conducted PROJECT : LOW CARBON CITY FRAMEWORK (LCCF) REPORTING PERIOD : 1/8/2013 – 31/8/2013
2
Copyright Reserved GreenTech Malaysia 2 Activities Completed (During reporting period) Data collection and analysis in progress at all 4 pilot sites (26-30 aug) (50% completed) Preparations for Advance Training, Train the Trainers (TTT), and 10% Energy & Water reduction training sessions [training materials, contract for trainers] (20% completed) BCiS Phase 2 development (55% completed) Review of framework and assessment system (20% completed) Discussion with Cyberview (26 Aug) % completed: 50% % funds utilised: 45% Activities Planned (For next reporting period) Continue with engagement, data collection, and analysis at all 4 pilot sites (23-27 sep) Continue with engagement with potential strategic partners, MoU with MBPJ (23-27 sep) Finalise reports for Cyberjaya and Tasik Kenyir (16-20 sep) Preparations for Advance Training, Train the Trainers (TTT), and 10% Energy & Water reduction training sessions [training materials, contract for trainers] (target November 2013) Continue with BCiS Phase 2 development (target December 2013) Preparations for Roadshow (target November 2013) Continue development and improvement of framework; engagement session with GBI, REHDA, JKR, and CIDB (16-20 sep) Continue development and improvement of calculator (9-13 sep) PROJECT : LOW CARBON CITY FRAMEWORK (LCCF) REPORTING PERIOD : 1/8/2013 – 31/8/2013
3
Copyright Reserved GreenTech Malaysia 3 Impacts of the Project No measurable impact to date Photos of activities for the period of reporting Challenges Data collection to fulfil requirements of the calculator Confusion on industry’s part – too many schemes Actions Engagement with key stakeholders planned for October PROJECT : LOW CARBON CITY FRAMEWORK (LCCF) REPORTING PERIOD : 1/8/2013 – 31/8/2013 No photos this reporting period
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.