Download presentation
Presentation is loading. Please wait.
Published byJayson Williams Modified over 9 years ago
1
Nov. 2005Calorimeter Commissioning R. Teuscher 1 Calorimeter Commissioning in 2006 2005200620072008 1: Testbeam 2: Installation, Cosmic Ray Commissioning 3: Single beam 4: First LHC collisions 5: First Physics
2
Nov. 2005Calorimeter Commissioning R. Teuscher 2
3
Nov. 2005Calorimeter Commissioning R. Teuscher 3 TileCal Phase 1 Work packages: Now – Feb ‘06 Services (WP 2) –Trigger cables, fibres, etc. installed on detector –Full cooling, etc. Front-end electronics (WP 4) –128 superdrawers –128 LVPS produced, installed & QC’d –Repairs to dead channels etc. Back-end electronics (WP 7) –ROD system readout for 2 partitions Connections verified, no fibres swapped –Module # ROD fragment ID DSP in passthrough or simple calc. Racks completed (WP3) –HV supplies –200V LV supplies + AUX board + LV - CAN –ADC + HV CANbus –TTC Calibration (WP 13) –CIS, Cs, laser timing DCS (WP 11) –Monitoring LV, HV, temperature –Automated warnings Trigger (WP 6) –4 coincidence boards installed in USA15-Level 2 9U VME crate in reserved rack 4 final transition boards –LVL1-Calo patch panels –48 short cables from patch panels to coincidence boards –Trigger menu: Back-to-back: 48 SD –(12*2 top + 12*2 bottom) Single tower: 24 SD –12*2 on bottom Trigger / noise thresholds OK Monitoring for data quality –GNAM / online –Athena / HLT –Event display Offline analysis with Athena as now
4
Nov. 2005Calorimeter Commissioning R. Teuscher 4 TileCal commissioning schedule (ATLAS schedule 26Oct link ), start is delayed ~ 1 weeklink Sectors (Link to sectors assignments)Link to sectors assignments Fingers (16finge rs/secto r) Trigger cable installatio n by TC SD repairs/tests with MobiDICK (previous MobiDICK results shown in GREEN MobiDAQ results shown in BLUE ) Services Routing (TC) +connectio ns + LV MobiDAQ / ROD Commissioning TILE TEAM 1 TILE TEAM 2 TILE TEAM 3 TILE TEAM 4 Sectors LB# (A+C) (2 days / 16 fingers) To be done before Team 3 starts + new failures/repairs during Team 3 activity TOTAL = 37 or (23+20) (~25%) (3 days / 16 fingers) (Initial 6 days / 16 Fingers) (Official 6 days / 16 Fingers; after this there is no services access) Sector 5 13 – 208 – 9 Nov (Insert LBA15 + LBC15), LBA17, LBC16 * (MobiDICK, MobiDAQ); LBC17LBA15LBC15LBA17MobiDICKMobiDAQLBC17 5 or (4+2) 10 – 14 Nov 15 – 22 Nov16 – 23 Jan Sector 3 5 – 12 22 – 23 Nov LBA05LBA05, LBC10 * (MobiDICK, MobiDAQ), LBC12; LBC05MobiDICKMobiDAQ LBC12LBC05 4 or (3+2) 24 – 28 Nov 29 Nov – 6 Dec Sector 7 21 – 28 24 – 25 Nov LBC231 29 Nov – 1 Dec 2 – 6 Dec7 – 14 Dec Sector 9 29 – 363 – 4 Nov LBA34LBA34, LBA35 * (MobiDICK, MobiDAQ), LBC36; MobiDICKMobiDAQ LBC36 3 or (3+1)2 – 6 Dec 6 – 14 Dec15– 21 Dec Sector 13 45 – 522 – 5 Dec LBA45 * (MobiDICK, MobiDAQ), LBA52 * (MobiDICK, MobiDAQ), LBC47, LBC48, LBC49, LBC50, LBC51, LBC52; LBA48MobiDICKMobiDAQMobiDICKMobiDAQLBC47 LBC48LBC49LBC50LBC51LBC52 LBA48 9 or (8+3)7 – 9 Dec 15 – 22 Dec6 – 13 Jan Sector 1 61 – 47 – 18 Jan LBA61LBA61; LBA62, LBA64, LBA04, LBC61, LBC01LBA62LBA64LBA04LBC61 LBC01 6 or (1+5)19 – 23 Jan 24 – 31 Jan1 – 7 Feb Sector 15 53 – 6019 – 20 JanLBC55LBC55, LBC58;LBC58224 – 25 Jan 26 – 31 Jan Sector 11 37 – 4425 – 26 Jan LBA40 * (MobiDICK, MobiDAQ), LBC39; LBA37, LBA39, LBA42, LBA43, LBC44MobiDICKMobiDAQLBC39 LBA37LBA39LBA42LBA43LBC44 7 or (2+6)27 – 31 Jan 1 – 8 Feb22 Feb – 1 Mar TileCal teams working by sectors (8 phi sections) together with teams from LAr + Inner detector + muon system. Also Team 5 (offline data quality)
5
Nov. 2005Calorimeter Commissioning R. Teuscher 5 Combined Calorimeter Milestones for 2006 Date in ‘06TileCalLAr Now – Mar.Barrel Phase 1 Jan. – Mar.EB Phase 1Barrel cold Apr.Phase 2: integration + Field Map Phase 2: integration + Field Map May - DecPhase 2-3: Barrel cosmic runs JuneEndcap C cold Jul. – DecPhase 2-3: Endcap C cosmic runs Aug.Endcap A cold Oct – DecPhase 2-3: Endcap A cosmic runs As in 2004, Expert weeks followed by stable running. Dates not written in stone, but provide milestones to judge our progress.
6
Nov. 2005Calorimeter Commissioning R. Teuscher 6 ATLAS Installation Schedule Peter Jenni, ATLAS Overview Week, Paris, October 2005 Barrel cosmics Endcaps April ’07: Global ATLAS cosmic run
7
Nov. 2005Calorimeter Commissioning R. Teuscher 7 Reminder: Cosmic Trigger (WP 6.1) 4 Chicago coincidence trigger board constructed –(LAr also interested in building additional boards if needed for endcaps) –With 4 boards in hand: 4 * 12 = 48 superdrawers (8 towers / SD) –Connection now via transition board to temporary TileCal trigger cables in USA15, Level -1 racks –Permanent rack location reserved in USA15 Level -2 racks next to LVL1-Calo Patch panels –Need to construct intermediate cables from Patch panels (time + manpower) Also split LB + EB signals to 2 coincidence boards –Second set of 4 transition boards being constructed for outputs from LVL1- Calo Patch panels / Receivers Nature 14 July 2005
8
Nov. 2005Calorimeter Commissioning R. Teuscher 8 1. Back to back towers (barrel) 2. Single tower (exbarrel or barrel) Two Trigger Modes
9
Nov. 2005Calorimeter Commissioning R. Teuscher 9 Configuration for 4 Trigger boards 24 SuperDrawer (SD) top x 24 SD bottom, Single-tower trigger A B C D 1 2 3 4 A: 12 SD B: 12 SD D: 12 SD C: 12 SD Four Coinc. Boards
10
Nov. 2005Calorimeter Commissioning R. Teuscher 10 LTP (Local Trigger Processor) For final ATLAS CTP (Central Trigger Processor) chain to subdetectors For cosmics: Chain TileCal trigger to LAr Needs master / slave unit being designed for 2 partitions, ready early ‘06 LTP TTC partitions of Sub-system 1 LTP TTC partitions of Sub-system 2 P.Farthouat / T.Pauly
11
Nov. 2005Calorimeter Commissioning R. Teuscher 11 StartFinishedLAr DAQ needsTileCal DAQ needs LAr Barrel Warm 01/01/0628/02/061 + 1 partition 19 ROS, 75 ROBIN, 1 Event Builder PC ROS: 2x2 = 4 ROBIN: 3x4 = 12 LAr Barrel Cold calib 01/03/0630/04/06same LAr Barrel + Tiles cosmics 01/05/06Up to 2007 same+ LTP master/slave board LAr ECC Warm 01/03/0630/04/063 partition, 8 ROS, 31 ROBIN, 1 EB PC ECC Cold01/05/0630/06/06same Barrel + ECC01/07/06 ECA warm01/05/0630/06/063 partition, 8 ROS, 31 ROBIN, 1 ROS PC ECA cold01/08/0630/09/06 Barrel + 2 EC01/10/0633 ROS*, 130 ROBINROS: 2x4 = 8 ROBIN: 3x8 = 24 DAQ Milestones in 2006 * 50 ROS PC’s planned by TDAQ for January ’06 OK
12
Nov. 2005Calorimeter Commissioning R. Teuscher 12 Discussion Informal TileCal + LAr Meeting held at CERN ~month ago –TileCal: Phase 2 + 3 coordinators + subsystem experts + … –LAr: Phase 3 Barrel + Endcap coordinators + subsystem experts + PL +... Learned that external scintillators at IP are not an attractive option for LAr –At most 2-3 weeks available in Fall ’06 Outcome: LAr will produce a document to be reviewed by TileCal + Institute Board –See attached document + questions at end of this talk
13
Nov. 2005Calorimeter Commissioning R. Teuscher 13 First of all the clear goal of the barrel phase 3 commissioning is to demonstrate that the detector can operate in a stable mode during months. Full detector calibration –Demonstrate software calibration + db is working ! –Will start in February 2006 (as soon as the barrel cryostat is cold) –Needs to be fully operational before cosmic muons run starts –Pedestal, Ramps, Calibration pulses + OFCs –COOL/POOL db integration –Monitoring + Bad cells at calibration level Bad physics signal shape –Define “bad” signals in Physics with seeking algorithms + monitoring –Cross check calibration level results with results from the installation, and cold commissioning in B180 LAr Goals for Cosmic Runs (1/2) (M. Aleksa)
14
Nov. 2005Calorimeter Commissioning R. Teuscher 14 S( )/N 7 Barrel middle compartment Test-beam data Muon signal in barrel EM calorimeter Due to Accordion geometry, muons are reconstructed in middle compartment by summing two cells in . Note : S/N ratio too small in strip and back compartments central cell With 10000 events, muon signal can be measured with ~ 0.3% precision
15
Nov. 2005Calorimeter Commissioning R. Teuscher 15 LAr Endcap Dates (1/2) (E. Monnier) Side C: 1. Tile EBC assembly, 11/05 2. Lowering of ECC, 21/11/05 3. Completion of EBC mech. assembly, mid 01/06 4. ECC moved in, connection of services, full access to Barrel and EBC, mid 02/06 5. ECC Warm test 03–04/06 (Coherent noise, Daq) 6. ECC Cold test 05-06/06 (Noise, Calib, Sig. rec…) 7. ECC + Barrel 07/06
16
Nov. 2005Calorimeter Commissioning R. Teuscher 16 LAr Endcap Dates (2/2) (E. Monnier) Side A: 1. Tile EBA assembly, 01/06 2. Lowering of ECA, 02/06 3. Completion of EBA assembly, 03/06 4. ECA/C moved in, Solenoid field mapping, 04/06 5. Re-opening and full access for connection of services, 05/06 6. ECA Warm test 05-06/06 7. ECA Cold test 08-09/06 8. ECA + Barrel + ECC 10/06
17
Nov. 2005Calorimeter Commissioning R. Teuscher 17 ATLAS Commissioning View: Main steps up to spring cosmics (G. Mornacchi + P. Perrodo – ATLAS Overview Week, Paris, October ‘05) Intermediate steps –Individual barrel calorimeter partitions Integration with DAQ (ROS system) Event building and data recording Individual DCS systems operational Monitoring and analysis –E.g. local (at P1) analysis of data from a run –Infrastructure for local analysis –Detector software for analysis Data bases: access Surface proto-control room –Combined calorimeters Common trigger distribution (LTPs, CTP) Common central DCS (e.g. alarms) Surface proto-control room Combined barrel calorimeters, cosmic run (May 06) –Cosmic trigger –Analysis software
18
Nov. 2005Calorimeter Commissioning R. Teuscher 18 ATLAS Commissioning Meetings (G. Mornacchi / P. Perrodo) Address Phase 2 issues Monday afternoons Goals –Single place where phase 2 issues are discussed –Put different actors together, identify problems –Define Phase 2 Work Packages 19/9/05 (TMB)ROS, trigger 26/09/05DCS: CIC 10/10/05DSS, interlocks 17/10/05Data bases (?) 24/10/05(TMB)Proto control room Location and functionality 31/10/05Detector requirements for R/O & monitoring 07/11/05DAQ/ROS status 14/11/05DAQ/EB options 21/11/05 28/11/05 (TMB) 05/12/05 12/12/05 19/12/05
19
Nov. 2005Calorimeter Commissioning R. Teuscher 19 Integral to ATLAS Management Operation Model Periodic Cosmic Runs in Spring 2006 Training of (proto-) Run Coordinators (F. Gianotti)
20
Nov. 2005Calorimeter Commissioning R. Teuscher 20 BACKUP
21
Nov. 2005Calorimeter Commissioning R. Teuscher 21 Amplitude inter-calibration in – Summing modules in Time inter-calibration –Energy/time rec. with OFC needs pulse vs 40 MHz clock phase –Cross-check relative timing of middle layer cell predicted at ~0.8 ns (calibration pulses + cables lengths, systematics, t.o.f.) The pulse versus 40MHz clock phase will be delivered by the TileCal time reconstruction. We need an accuracy around 1.5ns. This time phase (corrected for the time of flight of a muon from the IP) needs to be independent on eta and phi (i.e. independent of the Tile trigger tower) –Intercalibration of the timing of different TileCal trigger towers is very important. –Will be checked with the data of the TileCal September expert week. LAr EM Positioning –~ 0.025/8/ 12 in using strips –~ 0.025/10 in with middle cells Study ‘high’ energy events (above ~2 GeV) Extract drift time from 32 sample events LAr Goals for Cosmic Runs (2/2) (M. Aleksa)
22
Nov. 2005Calorimeter Commissioning R. Teuscher 22 Amplitude inter-calibration in – Per cell: / N/290 MeV – Uniformity: / ~ 0.5% with 40000 /cell – Group cells in (48) 1000 /cell Time inter-calibration – 100 /cell, can check physics timing at 0.6 ns LAr EM Positioning to be investigated Events above ~2 GeV to be investigated Drift time from 32 sample events to be investigated G3 results: projective 0.042±0.005 Hz, pseudo-projective 0.153±0.010 Hz 100 µ/cell 106 full days (29) with 1.0 GeV Tile threshold, =±0.1, =12 0.1 projective 0.027±0.004 Hz, pseudo-projective 0.098±0.008 Hz 165 full days (45) with 1.5 GeV Tile threshold (3840 top cells) LAr Data taking (M. Aleksa) At least 100 days of data-taking necessary to obtain useful results Our preferred trigger would be single-tower trigger (on bottom modules) Then we could in principle take data with only 2 trigger board (sharing with EC possible)!
23
Nov. 2005Calorimeter Commissioning R. Teuscher 23 Questions from LAr to TileCal 1.Is it possible to trigger and read independently the Tile barrel and extended barrel(s)? Answer: Trigger: Yes, it is possible. A cable / splitter would be needed to split the LB/EB signals from the LVL1-Calo patch panels to two separate Chicago transition modules. Readout: Yes. The ROD readout is grouped by TTC partitions, and LB/EB are separate partitions. Event building would be necessary. 2.It might be useful to trigger on the barrel in order to have projective muons in the LAr endcap. Answer: Could be difficult, required LB+EB to be in final position. During many periods in ’06 the EB’s are scheduled to be moved back and forth in z for muon big wheel installation etc. Some “quiet periods” should be checked.
24
Nov. 2005Calorimeter Commissioning R. Teuscher 24 Questions from LAr to TileCal (cont.) 3.LAr plans to have 4 experts on call (Front End + cooling, Backend + Online, DCS + interlock, Monitoring + offline), can a similar effort be provided by the TileCal group over a long period while some work will have to be done on the extended barrels? Answer: Comments invited from all TileCal members + Institute Board 4.Should dedicated expert meetings / discussion start before the end of the year? Depends on positive answer from TileCal. Last dedicated meeting was very productive. Useful to coordinate with ATLAS weekly commissioning meetings. Question to LAr: Help with manufacture of 48 intermediate trigger cables + connectors in USA15 from LVL1-Calo Patch Panels to coincidence boards?
25
Nov. 2005Calorimeter Commissioning R. Teuscher 25 Summary - Todo Complete TileCal Phase 1 commissioning Discuss Questions from LAr Prepare reply If positive, prepare plan with TileCal Work Package Managers for status + needs for Spring 2006 cosmic ray run –Could be in form of short document –Include requirements for central services TDAQ, HLT, Central DCS, etc.
26
Nov. 2005Calorimeter Commissioning R. Teuscher 26 ATLAS Experts Build upon existing structures Subdetector experts –Commissioning Phase 2/3 coordinators –Front-end –ROD / DAQ / online tools –HV –DCS / interlock –HLT Monitoring Meeting last week with TileCal & HLT monitoring group –Offline software & database Central ATLAS systems –TDAQ –LTP (Local trigger processor) –Central DCS to collect warnings from subsystems –Basic Control room on surface –Network & Computing Run coordinators –Meetings Commissioning coordinators
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.