Download presentation
Presentation is loading. Please wait.
Published byChristal Ferguson Modified over 8 years ago
1
A Walk Around Parts of the West Presented by Frederick J. Schmidt September 23, 2010
2
Holland & Hart’s Footprint “With a national first-tier ranking and 76 metropolitan first-tier rankings, Holland & Hart has more metropolitan first-tier rankings than all but five firms in the entire U.S.” - Steven Naifeh, President and Founder, Best Lawyers
3
Holland & Hart White Paper Read the White Paper at: www.hollandhart.com/2009TransmissionSitingWhitePaper
4
Wyoming-Colorado Intertie Energy Gateway (West & South TransWest Express High Plains Express Zephyr Overland Intertie SWIP ON Line Major Transmission Projects Under Development
5
Energy Gateway
6
TWE Projects Summary
10
Source: NVEnergy 2009 RPS Compliance #10-04002; Pg. 10 of Application SOLAR GEOTHERMAL WIND BIOMASS METHANE H HYDRO WASTE HEAT RECOVERY In Operation Under Development Under Construction Dashed line represents proposed 500 KV ON Line Transmission
11
Source: Sierra Pacific Power Company IRP – #10-07003 Technical Appendix, Pg. 9 of 271 Renewable Energy Zones (“REZ”) from Governor’s RETAAC New Transmission Required by NVEnergy to Access Renewable Resources Code (B-Biomass, G- Geothermal, S-Solar, and W- Wind)
12
Thank You Questions? Frederick J. Schmidt Holland & Hart LLP Carson City Office 775-684-6008 FSchmidt@hollandhart.com
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.