Download presentation
Presentation is loading. Please wait.
Published byMervyn Gallagher Modified over 8 years ago
1
C ALIFORNIA C OASTAL C OMMISSION S OUTH C ENTRAL C OAST D ISTRICT S LIDE 1
2
I TEM T U 9 A S LIDE 2 Project Location
3
I TEM T U 9 A S LIDE 3 Linden and Casitas Pass Interchanges (1.1 miles) Linden and Casitas Pass Interchanges (1.1 miles) Ventura / Santa Barbara HOV Lanes (6.0 miles) Ventura / Santa Barbara HOV Lanes (6.0 miles) South Coast 101 HOV Lanes (10.9 miles) South Coast 101 HOV Lanes (10.9 miles) Milpas to Hot Springs Operational Improvements (2.0 miles)
4
I TEM T U 9 A S LIDE 4 09_11_15 Bike Path
5
I TEM T U 9 A S LIDE 5 4,000 linear foot shared use bicycle and pedestrian access pathway Proposed 110-foot span prefabricated bridge over existing UPRR rail tracks
6
I TEM T U 9 A S LIDE 6
7
I TEM T U 9 A S LIDE 7 Pacific Ocean Carpinteria Slough UPRR Tracks Coast Route Bike Path To Carpinteria To Santa Barbara
8
I TEM T U 9 A S LIDE 8 Transportation Corridor Wetland Overlay District
9
I TEM T U 9 A S LIDE 9 Transportation Improvement Portion of Whitney Parcel
10
I TEM T U 9 A S LIDE 10 Whitney Site Agriculture Overlay District
11
I TEM T U 9 A S LIDE 11 Linden and Casitas Pass Interchanges (1.1 miles) Linden and Casitas Pass Interchanges (1.1 miles) Ventura / Santa Barbara HOV Lanes (6.0 miles) Ventura / Santa Barbara HOV Lanes (6.0 miles) South Coast 101 HOV Lanes (10.9 miles) South Coast 101 HOV Lanes (10.9 miles) Milpas to Hot Springs Operational Improvements (2.0 miles)
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.