Agenda Safety Schedule Machine and system reports 2/26/2016G. Robert-Demolaize, Time Meeting1
2
Safety and training Safety:Ray Karol 2/26/2016G. Robert-Demolaize, Time Meeting2
3
Schedule As of 1/19: work with protons in AGS behind RHIC operations. Physics store (as of 1/19): 111x111, 1.2x10 9 Au/bunch, ~93% efficiency. Turnaround time is close to 30 minutes. On 1/14, at 19:00, Stochastic Cooling was for the first time successfully turned on in Yellow (see K. Brown’s talk next) !! Over the long weekend, 16 4-hours store have been delivered. A few hours were lost on Sunday due to an abort kicker pre-fire and yo1-th8 that had to be replaced. Recent issues dealt with: –AGS J7 plunging target: taken out during maintenance; –recovery from APEX/Maintenance: delayed due to a short in the Booster F6 extraction septum magnet + LLRF setup change (software/coding issue); –Yellow longitudinal stochastic cooling: vacuum problem, kickers not operating; –beam rebucketing: still under investigation, possible 8h beam development period on 1/21. Coming up this week: APEX during the day of 1/20. Next maintenance day: 1/27. 2/26/2016G. Robert-Demolaize, Time Meeting3
4
Machine and system reports RHICKevin Brown STARGeorge Igo PHENIXStefan Bathe APEXMei Bai 2/26/2016G. Robert-Demolaize, Time Meeting4
5
Machine and system reports MaintenancePaul Sampson OperationsPeter Ingrassia BLIPLeonard Mausner RCFMichael Ernst 2/26/2016G. Robert-Demolaize, Time Meeting5
6
2/26/2016G. Robert-Demolaize, Time Meeting6 Next Time meeting Next Time meeting: Jan. 26 th, 2010 !!