Download presentation
Presentation is loading. Please wait.
Published byMorgan Norman Modified over 9 years ago
1
SEC #11 WG4 Status & Release 1 Outlook Group Name: Source:,, Meeting Date: Agenda Item:
2
SEC 11 theoretical Target: Freeze TS-0003 – Significant support to maintain release date – Outside threats to oneM2M are emerging Need to sort out: – What can realistically make it to Release 1 – What needs to be postponed to later releases Let’s assess the current status of WG4 work © 2014 oneM2M Partners 2
3
Security Bootstrapping i.e. procedure done once at service subscription Substantial content in TS-0003 – Several options considered Symmetric or asymmetric credentials Derivation from pre-existing credentials 8 related contributions at SEC 11
4
Security association i.e. Security procedure repeated during service Substantial content in TS-0003 – 2 purpose to distinguish Field to infrastructure, required to secure infrastructure Field to Field, to address the need of M2M applications – Several options considered Direct schemes based on configuration Schemes relying on central key distribution service 10 related contributions at SEC 11
5
Authorization & Access Control i.e. procedure for accessing resources ACP Procedure clarified in TS-0003 – Though maybe not included in proper section? – To finalize in WG2 TS-0001 Delegation through token not yet described 9 contributions on the topic at SEC11 – structure and content for new specific clause – Proposal for access token management
6
Identification and authentication Generic authentication description in TS-0003 – 5 related contributions at SEC 11 – New options: Identity based Hybrid Group authentication No consideration yet for anonymity – 1 related contribution at SEC 11
7
Security API i.e. offer security services to M2M applications No significant material yet in TS-0003 2 related contributions at SEC 11
8
SEC 11 proposal Let’s focus on finalizing the major procedures – Bootstrapping – Security Association: At least for infrastructure protection – Authorization and Access Control: at least ACP based For remaining options, assess status on Thursday – Rel 1 or later depends on progress in other WGs Align Wi-0007 schedule accordingly
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.