Download presentation
Presentation is loading. Please wait.
Published byHugo Stevens Modified over 8 years ago
1
OXY’s Cascade Canyon Road Road is being constructed entirely on private land owned by OXY and will have no public access Road is being constructed to significantly reduce travel time between wells and decrease traffic on County and other roads –Provides safer access for our employees and contractors –Reduces vehicle miles and energy usage –Decreases vehicle trips on public roads Road does not provide access to the BLM’s Roan Plateau Planning Area This road is part of OXY’s overall goal to limit the impact of our operations to adjacent landowners and the traveling public and provide a safe work environment for our employees and contractors –Use of this road coupled with the availability of temporary housing for workers (via Special Use Permit application to Garfield County) will assist us in meeting this goal
2
Location of OXY’s Cascade Canyon Road
3
Approximate Location of BLM’s Roan Plateau Planning Area
4
Approximate locations of 2 OXY wells Location of OXY’s Cascade Canyon Road Existing Access Route Between Wells – App. 26 miles
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.