Download presentation
Presentation is loading. Please wait.
Published byMaximilian McGee Modified over 9 years ago
1
2015 TRAC Presentation Marion 3-OH-9 Intermodal ODOT District Six Brian Davidson Project Manager Planning & Engineering
2
TRAC Request: Tier 2 $1.5 M Detailed Design $1.5 M Right-of-Way TRAC Request: Tier 2 $1.5 M Detailed Design $1.5 M Right-of-Way Marion 3-OH-9 Intermodal
3
Current: 18 Blockages Per Day Impacts: MIC Trucks Senior Center Developmental Disabilities Center Baseball for Youth Problem/Issue Blocked Crossing Events Per Day Event Description# BlockagesTime Arriving/Departing train from Kansas City210-15 minutes Arriving/Departing train to North Baltimore2 10-15 minutes Arriving/Departing local lumber & auto2 10-15 minutes Arriving/Departing train to St Louis2 10-15 minutes Switching maneuvers for trains above10 10-15 minutes
4
Intermodal Site History
5
New Railroad Overpass Current configuration Proposed Improvement
6
FREIGHT CORRIDORS
7
Development MIC Freight 2011 - 40,340 Containers 2012 - 44,671 Containers 2013 - 46,866 Containers 2014 - 53,821 Containers 2015 - 70,000 Containers 2016 - 90,000 Containers expected
8
Budget & Funding Construction Cost Reduced by $4M PhaseEstimated Cost Preliminary Engineering$ 0.8 M Detailed Design$ 1.5 M R/W$ 1.5 M Construction$ 8 M TOTAL$ 11.8 M
9
Marion 3-OH-9 Intermodal TRAC Request: Tier 2 $1.5 M Detailed Design $1.5 M Right-of-Way TRAC Request: Tier 2 $1.5 M Detailed Design $1.5 M Right-of-Way
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.