2015 TRAC Presentation Marion 3-OH-9 Intermodal ODOT District Six Brian Davidson Project Manager Planning & Engineering.

Similar presentations


Presentation on theme: "2015 TRAC Presentation Marion 3-OH-9 Intermodal ODOT District Six Brian Davidson Project Manager Planning & Engineering."— Presentation transcript:

1 2015 TRAC Presentation Marion 3-OH-9 Intermodal ODOT District Six Brian Davidson Project Manager Planning & Engineering

2 TRAC Request: Tier 2 $1.5 M Detailed Design $1.5 M Right-of-Way TRAC Request: Tier 2 $1.5 M Detailed Design $1.5 M Right-of-Way Marion 3-OH-9 Intermodal

3 Current:  18 Blockages Per Day Impacts:  MIC Trucks  Senior Center  Developmental Disabilities Center  Baseball for Youth Problem/Issue Blocked Crossing Events Per Day Event Description# BlockagesTime Arriving/Departing train from Kansas City210-15 minutes Arriving/Departing train to North Baltimore2 10-15 minutes Arriving/Departing local lumber & auto2 10-15 minutes Arriving/Departing train to St Louis2 10-15 minutes Switching maneuvers for trains above10 10-15 minutes

4 Intermodal Site History

5 New Railroad Overpass Current configuration Proposed Improvement

6 FREIGHT CORRIDORS

7 Development MIC Freight 2011 - 40,340 Containers 2012 - 44,671 Containers 2013 - 46,866 Containers 2014 - 53,821 Containers 2015 - 70,000 Containers 2016 - 90,000 Containers expected

8 Budget & Funding Construction Cost Reduced by $4M PhaseEstimated Cost Preliminary Engineering$ 0.8 M Detailed Design$ 1.5 M R/W$ 1.5 M Construction$ 8 M TOTAL$ 11.8 M

9 Marion 3-OH-9 Intermodal TRAC Request: Tier 2 $1.5 M Detailed Design $1.5 M Right-of-Way TRAC Request: Tier 2 $1.5 M Detailed Design $1.5 M Right-of-Way