Presentation is loading. Please wait.

Presentation is loading. Please wait.

20132015 AprJulOct2014AprJulOct2015Apr Kick-Off 5/1/13 Minimal Prototype 9/30/13 Submission 11/25/13 Release Web Prototype 3/1/14 Online Testing 5/20/14.

Similar presentations


Presentation on theme: "20132015 AprJulOct2014AprJulOct2015Apr Kick-Off 5/1/13 Minimal Prototype 9/30/13 Submission 11/25/13 Release Web Prototype 3/1/14 Online Testing 5/20/14."— Presentation transcript:

1 20132015 AprJulOct2014AprJulOct2015Apr Kick-Off 5/1/13 Minimal Prototype 9/30/13 Submission 11/25/13 Release Web Prototype 3/1/14 Online Testing 5/20/14 Release 3/15/15 Integration 10/30/13 Validation 7/22/14 Exec Review 1/1/15 System Design 143 days 5/13 - 11/13 80% Coding 74 days 11/13 - 3/14 73% Code Improvements 127 days 3/14 - 8/14 56% Stabilization 43 days 8/14 - 10/14 20% Integration with Website 76 days 8/14 - 11/14 15% User Acceptance 98 days 10/14 - 2/15 Documentation 104 days 1/15 - 5/15

2 To change and update this template automatically, download the free Office Timeline PowerPoint add-in! Office Timeline is a free, award winning, Gantt chart maker that's easy to use.  Simple, easy-to-use wizards.  Professional, quick results.  Built directly into PowerPoint

3 Download Now www.OfficeTimeline.com/download Get the Free Edition Now Easily edit this template or create your own beautiful Gantt chart, quickly, right inside PowerPoint! Copyright © 2012, Office Timeline, LLC. All rights reserved.


Download ppt "20132015 AprJulOct2014AprJulOct2015Apr Kick-Off 5/1/13 Minimal Prototype 9/30/13 Submission 11/25/13 Release Web Prototype 3/1/14 Online Testing 5/20/14."

Similar presentations


Ads by Google