Presentation is loading. Please wait.

Presentation is loading. Please wait.

Conventional Facilities and Siting Global Group Global Design Effort 08-24-07 CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, 2007 1 CFS EDR FNAL Kick-Off Planning.

Similar presentations


Presentation on theme: "Conventional Facilities and Siting Global Group Global Design Effort 08-24-07 CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, 2007 1 CFS EDR FNAL Kick-Off Planning."— Presentation transcript:

1 Conventional Facilities and Siting Global Group Global Design Effort 08-24-07 CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, 2007 1 CFS EDR FNAL Kick-Off Planning Meeting Overview of Regional Interest Efforts Vic Kuchler CFS Global Design Effort

2 Conventional Facilities and Siting Global Group Global Design Effort 08-24-07 CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, 2007 2 Current Status The Responsibilities of the CFS Group During the Transition to the EDR Phase of the Project will Definitely have an Expanded Focus The Responsibilities of the CFS Group During the Transition to the EDR Phase of the Project will Definitely have an Expanded Focus In Order to Keep Pace with the Technically Driven Schedule We will have to Devote Substantial Effort Toward the Regional Interest Aspects of the Project In Order to Keep Pace with the Technically Driven Schedule We will have to Devote Substantial Effort Toward the Regional Interest Aspects of the Project Each Region, and Perhaps Individual Countries, will need to Develop a Plan that will Lead to an Eventual “Expression of Regional Interest” for Each Proposed Site for the ILC Each Region, and Perhaps Individual Countries, will need to Develop a Plan that will Lead to an Eventual “Expression of Regional Interest” for Each Proposed Site for the ILC The Extent of Regional Interest Efforts will be Determined, Guided and Subject to the Approval of Many Separate and Distinct Entities and will Vary in Each Region and/or Country that Considers Hosting the ILC The Extent of Regional Interest Efforts will be Determined, Guided and Subject to the Approval of Many Separate and Distinct Entities and will Vary in Each Region and/or Country that Considers Hosting the ILC

3 Conventional Facilities and Siting Global Group Global Design Effort 08-24-07 CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, 2007 3 Factors that will Impact the Transition to EDR Global Design Effort (GDE) Solutions Based on the Three Regional Sample Sites Need Further Refinement with Respect to Specific Siting and Alignments Global Design Effort (GDE) Solutions Based on the Three Regional Sample Sites Need Further Refinement with Respect to Specific Siting and Alignments Current Designs Indicate the Approximately 30% of the ILC Conventional Facilities can be Considered Site Independent While 70% can be Considered to be Site Dependent Current Designs Indicate the Approximately 30% of the ILC Conventional Facilities can be Considered Site Independent While 70% can be Considered to be Site Dependent The CFS Group will Proceed under the Assumption that the Site Dependent Conventional Facilities will be Provided by the Host Country as Part of the Expression of Regional Interest The CFS Group will Proceed under the Assumption that the Site Dependent Conventional Facilities will be Provided by the Host Country as Part of the Expression of Regional Interest Based on this Assumption, Construction of these Facilities will be Completed under Local Standards, Codes and Governmental Regulations Based on this Assumption, Construction of these Facilities will be Completed under Local Standards, Codes and Governmental Regulations

4 Conventional Facilities and Siting Global Group Global Design Effort 08-24-07 CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, 2007 4 Participants in a United States Site Proposal The International Linear Collider Steering Committee will Eventually Provide Guidance for the International Site Selection Process The International Linear Collider Steering Committee will Eventually Provide Guidance for the International Site Selection Process Fermilab will need a Strategic Plan for Future Laboratory Activities Fermilab will need a Strategic Plan for Future Laboratory Activities Collar Communities and Counties will need to Incorporate this Project into Strategic Plans and Provide Input into the Process Collar Communities and Counties will need to Incorporate this Project into Strategic Plans and Provide Input into the Process The State of Illinois will have Stipulations, Requirements and also need a Strategic Plan The State of Illinois will have Stipulations, Requirements and also need a Strategic Plan The Office of Science in the Department of Energy Could Likely Oversee the Site Dependent Conventional Construction for the ILC in the United States The Office of Science in the Department of Energy Could Likely Oversee the Site Dependent Conventional Construction for the ILC in the United States Office of Management and Budget, Congress and the President will also need to Endorse the Project Office of Management and Budget, Congress and the President will also need to Endorse the Project All of this Effort will Take Financial Commitment All of this Effort will Take Financial Commitment

5 Conventional Facilities and Siting Global Group Global Design Effort 08-24-07 CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, 2007 5 CFS Efforts in the Americas Region As a Starting Point, the CFS Group will Begin to Explore the Feasibility for a Potential ILC Alignment that is Centered on the Fermilab Site and Extends in a North-South Orientation As a Starting Point, the CFS Group will Begin to Explore the Feasibility for a Potential ILC Alignment that is Centered on the Fermilab Site and Extends in a North-South Orientation This will be used as the Baseline to Compare Other Alignments Including the Possibility of a Site West of the Fox River Valley This will be used as the Baseline to Compare Other Alignments Including the Possibility of a Site West of the Fox River Valley CFS will also Pursue a Definitive Investigation of a Near Surface/Cut-and-Cover Design Solution CFS will also Pursue a Definitive Investigation of a Near Surface/Cut-and-Cover Design Solution Many Factors will need to be Identified and Compared in Order to Optimize an Eventual Proposed Site for the Americas Region/United States Expression of Regional Interest Many Factors will need to be Identified and Compared in Order to Optimize an Eventual Proposed Site for the Americas Region/United States Expression of Regional Interest

6 Conventional Facilities and Siting Global Group Global Design Effort 08-24-07 CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, 2007 6 So How to Proceed To Begin, Each Region will Produce a Set of Work Activities that will Develop Into a Work Package(s) to Define the Regional Interest Effort To Begin, Each Region will Produce a Set of Work Activities that will Develop Into a Work Package(s) to Define the Regional Interest Effort These Work Packages will then be Included in the Overall CFS EDR Plan These Work Packages will then be Included in the Overall CFS EDR Plan Local Influences (Described for the Americas Region Above) will need to be Identified and Incorporated into Each Regional Effort Local Influences (Described for the Americas Region Above) will need to be Identified and Incorporated into Each Regional Effort Once Identified, Regional and National Timeframes for Bid to Host Efforts will need to be Reconciled Once Identified, Regional and National Timeframes for Bid to Host Efforts will need to be Reconciled The International Site Selection Process will Also need to be Reconciled with the International Process The International Site Selection Process will Also need to be Reconciled with the International Process A Substantial Portion of this Process is Beyond the Control of the CFS Group A Substantial Portion of this Process is Beyond the Control of the CFS Group


Download ppt "Conventional Facilities and Siting Global Group Global Design Effort 08-24-07 CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, 2007 1 CFS EDR FNAL Kick-Off Planning."

Similar presentations


Ads by Google