Presentation is loading. Please wait.

Presentation is loading. Please wait.

Microsoft ® Business Solutions–Navision ® 4.0 Development II – C/SIDE Solution Development Day 3.

Similar presentations


Presentation on theme: "Microsoft ® Business Solutions–Navision ® 4.0 Development II – C/SIDE Solution Development Day 3."— Presentation transcript:

1 Microsoft ® Business Solutions–Navision ® 4.0 Development II – C/SIDE Solution Development Day 3

2 Managing Posting Lab

3 3 of 12 Conclusion We have created the tables and codeunits that make up the posting routines We are ready to integrate the different aspects of the solution that we have created and to integrate the solution into the standard Microsoft Navision interface

4 Managing Posting Review Questions

5 5 of 12 Review Journals and Ledgers Posting Routine Codeunits Navision Debugger and Code Coverage Low Impact Programming

6 Managing Integration

7 7 of 12 Managing Integration MenuSuite Object Levels –As a developer for a Microsoft Business Solutions Partner we should use the Partner Level (MenuSuite 80) –Menu buttons with the symbol “>>”are inherited from a previous object level –When merging MenuSuite objects, items that can’t be merged will be in the Lost Items group

8 8 of 12 Managing Integration Navigate Window –View a summary of entries with the same document number and posting date. –Available for posted entries

9 Managing Integration Lab

10 10 of 12 Review MenuSuite Object Navigate

11 11 of 12 Conclusion We integrated our seminar module features with one another by adding navigation to forms We added to the MenuSuite so that the seminar module functionality is accessible in a standard way We integrated the Navigate feature into the seminar module Next, we need to create reports

12 Managing Integration Review Questions


Download ppt "Microsoft ® Business Solutions–Navision ® 4.0 Development II – C/SIDE Solution Development Day 3."

Similar presentations


Ads by Google