Presentation is loading. Please wait.

Presentation is loading. Please wait.

L2 CAL Status Vadim Rusu For the magnificent L2CAL team.

Similar presentations


Presentation on theme: "L2 CAL Status Vadim Rusu For the magnificent L2CAL team."— Presentation transcript:

1 L2 CAL Status Vadim Rusu For the magnificent L2CAL team

2 L2 CAL status 2 The goal Improve the L2 MET resolution so that we can run at lower MET at L2  L1 only uses 8/10 bits  No L2 calculation in the current system Change the jet clustering so that we can control the rates at high luminosity  Current L2 clustering – pacman style MET+2 JETS JET40

3 L2 CAL status 3 The design L1CAL Dirac Board Calorimeter L2 CPU L2 Decision Crate 10-bits Energy/Tower 8-bits Global L2 Decision L2CAL Cluster Finder Dcas New Hardware Path L2 CPU Muon/XTRP/L1/SVT/XCES  Add new hardware to send the towers straight to the L2 PC  Get new PC for better performance (about time anyway)  Everything to be commissioned parasitically

4 L2 CAL status 4 The project An international mini-collaboration  Fermilab  Chicago  Madrid  Padova  Penn  Pisa  Purdue  Started – Oct 2006  Completed - ASAP

5 L2 CAL status 5 The know-how Use PULSARs as receivers for the LVDS data from DIRAC  Need to interface the 40 bit cables with the PULSAR  Build Mezzanine card Serialize the data in Slink format  Receive on PC through Slink-PCI boards TIMING GOAL ~ 20 us Pulsar Crate (6) 40-bit word/cable @ CDF_clk (132 ns) 6 slink outputs 6 slink outputs Slink merger Pulsars (8) PC Data transfer latency on average within ~10 us 32-bit @ 40 Mhz Pulsar Crate (6) 80 MhZ 32-bit @ 40 MhZ Clustering timing ~ 10 us Pulsar Crate (6) 6 slink outputs 80 MhZ 96 LVDS cables

6 L2 CAL status 6 The tool FPGA Altera LVDS Connector Pulsar side 40 EM HAD 10bits x4 = 40 @ cdfclk (132ns) input data per cable JTAG Pulsar front panel 160 CMC Connectors to the pulsar  L2 CAL mezzanine card

7 L2 CAL status 7 The tool Built at UC in record time  Thanks Henry and e-shop Tested and commissioned revision 1.0 over the holidays  Worked out of the box Ted makes good for the bet he lost.

8 L2 CAL status 8 The pieces Mezzanine design  Laura Testing/Checkout  Lucas, Miguel Firmware  Marco, Laura FER code  Massimo, Laura Simulation package  Simone D., Gene F. Monitoring  Giorgio + Simone P., Michael – Wojtek/Carla – consulting PC infrastructure and algo  Gene + Kristian Hahn – consultant PC interface  Anadi Preparing the celebrations (parties, happy hours, etc…)  myself

9 L2 CAL status 9 The status Boards – arrive over the month of February  Mezzanine, Slink, AUX (Henry – UC) Front panels and strain relief (Richard – UC)  Pulsars (Paola – Pisa) Cables – 80% in hand  Cable map (thanks JDL) Software – final testings Firmware – stage 1 ready to go

10 L2 CAL status 10 The plan Start splitting the cables one DCAS crate at a time starting next week Have half the DCAS system split and parasitically running by the end of February March have all system running parasitically April – new trigger tables May – Project completed  10 bit MET resolution  New Jet algorithm (cone based)

11 L2 CAL status 11 The future The L2 CAL trigger will be a very versatile system What the new L2CAL will provide:  10 bit MET at L2  Better L2 jet position  L2 jet closer to offline jets What else?  Angular correlations (jets, MET)  Track jet matching  Dijet mass New paradigm: Your offline analysis code can be implemented in the trigger  Use the L2 CAL simulation to do studies that will improve the trigger selection  Already starting on this in the context of HTTF

12 L2 CAL status 12 THE END


Download ppt "L2 CAL Status Vadim Rusu For the magnificent L2CAL team."

Similar presentations


Ads by Google