Download presentation
Presentation is loading. Please wait.
Published byMartina Cunningham Modified over 8 years ago
1
1 WG FBA report Uroš Gabrijel IG Meeting, Vienna, May 9th 2008
2
2 Presentation outline HLM resolution toward the Concept – draft State of work within WG FBA
3
3 HLM resolution toward the concept – draft* (1) The commonly agreed definitions: Concept of the technical parameters; status as provided in Consentec document »Concept of the Technical Parameters Calculation for the Flow Based Capacity Allocation in the CEE Region«, dated 21 Dec., 2007. The Concept; as to be implemented in CAO, it comprises all technical parameters (AMF, PTDF, FRM, BFRM…) needed for FBA, allocation and curtailment methodologies, scheduling etc. *Ad hoc High Level Meeting 7.4.2008
4
4 HLM resolution toward the concept - draft (2) The roadmap for the Concept implementation is a step-by-step one, consisting of a chain of HLM approvals that refer to WG proposals, prepared on the base of the Consentec final Work Package reports. The final step for the Concept is a confirmation by HLM which is to be done before functional application. The IT implementation roadmap could be asynchronous to the Concept step-by-step implementation because of different deadlines where IT Function Specification has to be approved before contracting the IT vendor.
5
5 State of work within WG FBA (1) WP 1 Main phase with the data gathering process started on 1.4.2008 and will be finished today, 9.5.2008 Preliminary results from calculations raised some issues regarding long-term allocations. Solutions are under investigation and discussion Open Issues to be clarified hopefully by the deadline of WP1
6
6 State of work within WG FBA (2) State of work within WG FBA (2) Curtailment considered as an integrated part of the FBA concept One of modules of WP 3 will include curtailment evaluation First resolutions by WG FBA on Concept possible during the meeting on 8.7. after receiving final report on WP 1&2 from Consentec (end of June) Most possibly the recommendation for the Concept confirmation will be given after evaluation of tests’ results where influences of all agreed and not agreed issues could be ascertained. Risk of WG FBA failing to answer open questions in time
7
7 State of work within WG FBA (3)
8
8 Thank you for your attention!
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.