Download presentation
Presentation is loading. Please wait.
1
Capstone Project : Team #6 October 4 th,2007
2
2 Team Information Instructor : Dr. Kwok-Bun Yue Mentors : Dr. Kwok-Bun Yue Mr. Dilhar De Silva Team members : Shital Parikh Sandeep Chavva Pareddy Karunakar Reddy Srividya Subbiah
3
CSCI 6838 Team #6 - Fall 20073 Table of Contents Development Team Shital Problem AnalysisShital Project SpecificationVidya Project AbstractVidya Design & Implementation Constraints Vidya Functionality of future systemReddy Use case DiagramReddy Project Time LineReddy Prototype DesignSandeep Team ProgressSandeep Expected DeliverablesSandeep Activities AheadSandeep ConclusionSandeep
4
CSCI 6838 Team #6 - Fall 20074 Development Team Team Leader : Shital Webmaster : Karunakar Programmer : Karunakar, Sandeep, Shital & Vidya Technical Writer : Karunakar, Sandeep, Shital & Vidya Architecture Designer : Sandeep, Shital &Vidya DBA : Karunakar, Sandeep, Shital & Vidya
5
CSCI 6838 Team #6 - Fall 20075 Problem Analysis Shortcomings of the current website www.goscat.com www.goscat.com Lacks organized structure Has redundant links Information accessible to the public
6
CSCI 6838 Team #6 - Fall 20076 Problem Analysis (Conti..) Important functionalities of the existing website: Time standards Meet and event Calendar Practice Schedule Form for registering into the team
7
CSCI 6838 Team #6 - Fall 20077 Problem Analysis (Conti..) Meet and Event Schedule - Things to improve Not frequently updated No time and location No contact information Not clear for a new or general user Practice Schedule Not show for a year Information is not clear
8
CSCI 6838 Team #6 - Fall 20078 Problem Analysis (Conti..) Current website was built traditionally with HTML editors Website has limited capability and contents Difficult to navigate and maintain
9
CSCI 6838 Team #6 - Fall 20079 Project Specification The project aims to replace the existing website www.goscat.com using Joomlawww.goscat.com Joomla is a popular open source content management software (CMS) Advantage of CMS : Collaborative creation of website
10
CSCI 6838 Team #6 - Fall 200710 Project Specification (Conti..) Anatomy of CMS Content Creation Content Management Publishing Presentation About Joomla Based on PHP Similar to Mambo
11
CSCI 6838 Team #6 - Fall 200711 Project Specification (Conti..) Design and Layout are using XHTML and CSS Apart from the installation, they have a variety of extensions Easy to Installation and maintain Collaboration incorporation of social networking features
12
CSCI 6838 Team #6 - Fall 200712 Project Abstract New website will incorporate details of the old website and include the social networking features. Our project ends into two research papers : First paper – Is it desirable to build a social networking site as a team project in CS/CIS education? Second paper – How to build a domain specific social Networking site using CMS?
13
CSCI 6838 Team #6 - Fall 200713 Design and Implementation Constraints Joomla 1.0.13 - Stable version Apache 1.3 MySQL 4.0.2 PHP 4.3.11
14
CSCI 6838 Team #6 - Fall 200714 Functionality of the Future System The website will have the following functionalities : Users to create account Rate contents Upload Videos and pictures To have blog and chat sessions RSS based news feeds Google maps for swim meet directions
15
CSCI 6838 Team #6 - Fall 200715 Use case Diagram Executive/Manager/ Administrator View Specific Swimmer’s Profile Check In/Out Public/Guest View/download all Videos/Pictures Maintain template design, Global configuration Add New Articles Read Messages, Mass Mail Subscribe/Login View Event Schedules, Meet Entry Calendar View Contact Information /Map to pools Version Control Rate Contents FAQs
16
CSCI 6838 Team #6 - Fall 200716 Use case Diagram (Conti..) Login/ Logout Swimmers View News Feeds/ Event Schedules, Meet Entry Calendar Rate contents Post to Blogs View / Upload Pictures/Videos View Nutrition articles/ Health Issues View Swimmers News Role of Parents Benefits of Swimming Child’s training Parents FAQs
17
CSCI 6838 Team #6 - Fall 200717 Use Case Diagram (Conti..) Login/ Logout View /Upload Pictures/Videos Post to Blogs Rate Contents View Event Schedules, Meet Entry Calendar View Nutrition articles/ Health Issues View Coach Requirements View Coach News View Coach Information View Olympic Related articles View Sports Medicine Coaches Board Members
18
CSCI 6838 Team #6 - Fall 200718 Project TimeLine
19
CSCI 6838 Team #6 - Fall 200719 Prototype Design
20
CSCI 6838 Team #6 - Fall 2007 20
21
Prototype Design CSCI 6838 Team #6 - Fall 2007 21
22
Prototype Design CSCI 6838 Team #6 - Fall 2007 22
23
CSCI 6838 Team #6 - Fall 200723 Team Progress Requirement analysis have been completed Use case diagram have been completed Installation is complete Initial prototype of the future system has been designed
24
CSCI 6838 Team #6 - Fall 200724 Expected Deliverables Phase 1 UML 2.0 Analysis model using Visio and Prototype Phase 2 UML 2.0 Design model using Visio and beta version of the virtual community software Phase 3 UML 2.0 Sequence Diagram and General Availability version of the Virtual community software
25
CSCI 6838 Team #6 - Fall 200725 Activities Ahead Currently we are implementing the website on the local host, after this we will do it in a hosted site Initial prototype will be improved Remaining features and functionalities will be incorporated Content and capabilities of the website will be improved
26
CSCI 6838 Team #6 - Fall 200726 Conclusion Hence the future website developed using CMS will be: Easy to maintain Powerful Functional Flexible
27
CSCI 6838 Team #6 - Fall 2007 27 References 1.Bartz, Tonia, User Customization: Utilizing Content Management Systems to Efficiently Organize User Group Content, Summer 2006. 2.Websites: www.Joomla.org www.PHP.net www.APACHE.orgAPACHE.org www.MySQL.com http://www.cpdservices.com/53.0.html http://www.cpdservices.com/53.0.html
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.