12/06/2006 MFW Latest problems stem from RFT Module loosing phase lock. Greg Vogel informs us that the “real rf” is available in MI-10 since they ran optical fiber. I will attempt to get a Real 53 MHz connection for the RFT at MI-10. –May need to retime the bucket delays.
4
12/06/2006 TFW
5
12/06/2006 TeV E11 Gate Timing
6
12/06/2006 FW Integrator Timing
7
12/06/2006 TFW So Far Have re-timed in all three wires for fly spec 2 Need to check on flies in shot –17 pre-injection, p-bar injection tune-up –22 proton injection –3 P-Bar injection –30,31,32,33 flies up the ramp –1 start of HEP
8
12/06/2006 Test Loss Monitor at A0
9
12/06/2006 Pulsed LED Signal
10
12/06/2006 A0 Loss Monitor Test
11
12/06/2006 36 bunches in Tev Unfortunately the PMT is not Powered
12
12/06/2006 Support For new Wire at A0 Need –New Cables to Tunnel –New Computer –New VME Chassis –New Motor Control Hardware –PMT Power Supply Software –Minor modifications to generic FW code –Database Changes