Download presentation
Presentation is loading. Please wait.
Published byLoreen Daniels Modified over 8 years ago
1
Yue (Danny) Wang wang.yue3@husky.neu.edu supervised by Prof. Peter Furth
2
Source: HCM 2000, Chapter 18.
3
Pedestrians have to cross more than one stage and wait for a WALK in each stage. Diagonal crossing. Which way? A-B-C or A-D-C ? Bikes making two-stage (pedestrian-style) left turns are sometimes allowed to follow one direction only. There is more than one WALK interval per signal cycle. Crossing Boylston Street @ Charlesgate West, Boston
6
‘Diagonal Crossing’ accounts for the situation where pedestrians or bikes need to cross the intersection diagonally, and therefore make a two-stage crossing, with path choice. ‘Multi-stage Crossing’ accounts for the crossing where pedestrians or bikes have to cross many stages and wait for WALK interval during each stage.
7
Intersection Layout Signal Timing Plan St. Paul Street @ Beacon Street in Brookline, MA
9
Intersection Layout Signal Timing Plan
11
Existing plan.Proposed plan. Huntington Ave. @ Opera Pl, Boston, MA. SB 94s 66s NB SB 30s 29s NB
12
Existing plan. Proposed plan. Crossing Boylston St. @ Charlesgate West, Boston, MA. SB 68s 41s NB SB 36s 34s NB
13
Lead-Lead (EBL-WBL)Lag-Lag (EBL-WBL) Lead-Lag (EBL-WBL) Lag-Lead (EBL-WBL) St. Paul Street @ Beacon Street, Boston, MA SB61.431.8SB NB31.861.4NB SB31.466.4SB NB66.431.4NB SB41.4 SB NB16.2 NB SB16.2 SB NB41.4 NB
14
Riverway, Landmark, Boston, MA. 123s WB 124s EB
15
Riverway, Landmark, Boston, MA. 38s WB 38s EB 44s WB 45s EB
16
EBT NBT
17
Northeastern University Ped & Bike Crossing Delay Calculator and related files could be downloaded at: http://www.northeastern.edu/peter.furth/delaycalculator/
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.