Presentation is loading. Please wait.

Presentation is loading. Please wait.

Doc.: IEEE 802.15-09/0542r0 Submission July 2009 Dr. John R. Barr, JRBarr, Ltd.Slide 1 Project: IEEE 802.15 Working Group for Wireless Personal Area Networks.

Similar presentations


Presentation on theme: "Doc.: IEEE 802.15-09/0542r0 Submission July 2009 Dr. John R. Barr, JRBarr, Ltd.Slide 1 Project: IEEE 802.15 Working Group for Wireless Personal Area Networks."— Presentation transcript:

1 doc.: IEEE 802.15-09/0542r0 Submission July 2009 Dr. John R. Barr, JRBarr, Ltd.Slide 1 Project: IEEE 802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [802.18 Liaison Report July 2009] Date Submitted: [14July09] Source: [John Barr] Company [JRBarr, Ltd.] Address [21939 Old Farm Road, Deer Park, IL 60010] Voice:[+1 847 962-5407], FAX: [], E-Mail:[John.Barr@me.com] Re: [] Abstract:[Update on 802.18] Purpose:[Update on 802.18 Regulatory Committee] Notice:This document has been prepared to assist the IEEE 802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein.

2 doc.: IEEE 802.15-09/0542r0 Submission July 2009 802.18 Documents of Interest ERM_TG11(21)22 – Notes of the 21 st meeting of TG11 –ETSI Membership Required IEEE 802.18-09/0075r0 (Rich Kennedy) on EN 300 328 18-09-0077-00-0000-fcc-mban-nprm.doc 18-09-0082-01-0000-comments-on-fcc-nprm-ban.doc –Dave Davenport representing 802.15 TG6 18-09-0080-01-0000-imt-advanced-update.ppt –France and Germany objected to addition of 802.16 FDD and CDMA TDD modes Dr. John R. Barr, JRBarr, Ltd.Slide 2

3 doc.: IEEE 802.15-09/0542r0 Submission July 2009 Schedule Tuesday THz, FCC MBAN NPRM, EN 300 328, FCC NWBB NOI –Wednesday IMT Advanced, 802.19 TVWS, Update on Digital Divide –Thursday FCC MBAN NPRM, SE21 Dr. John R. Barr, JRBarr, Ltd.Slide 3

4 doc.: IEEE 802.15-09/0542r0 Submission July 2009 EN 300 328 Rich Kennedy’s Presentation –Encouraging 802.11 to remain active –Noted that 802.11 and 802.15 DSSS standards are considered compliant –Noted that 802.15 FHSS standard is considered compliant –Need to keep ETSI in loop regarding TG4g Dr. John R. Barr, JRBarr, Ltd.Slide 4

5 doc.: IEEE 802.18-09/0075r0 Submission July 2009 Rich Kennedy, Research In MotionSlide 5 ETSI EN 300 328 Changes ERM TG11 Progress Date: 2009-7-14 Authors:

6 doc.: IEEE 802.18-09/0075r0 Submission July 2009 Rich Kennedy, Research In Motion Introduction December 2007 ERM TG11 began a work item to write v1.8.1 of EN 300 328 –Applications limited to 10mW TX power under EN 300 440 want to be able to operate at 100mW Radio control model vendors Industrial controls manufacturers 802.15.4g (Smart Utilities Networks) Wireless speaker systems Meetings were dominated by the non-RLAN entities –Application-specific text was being added to the specification –Over time the document was becoming a “telephone book” –Decision was made to develop a “Medium Utilization” (MU) formula that would cover non-LBT applications Slide 6

7 doc.: IEEE 802.18-09/0075r0 Submission The Ground Rules Prior to the June meeting of TG11, a small group met to decide on an approach that would encompass all applications in one formula This needs to be a “victim oriented approach” It must be: –maximally effective –maximally generic –maximally practical –minimally restrictive “The role of the EN 300-328 can therefore only be to ensure that in case of congestion every compliant device does not take up an unreasonable fraction of the medium, therefore guaranteeing that any system making use of the same medium is not denied a fair fraction of it.” July 2009 Rich Kennedy, Research In MotionSlide 7

8 doc.: IEEE 802.18-09/0075r0 Submission Initial Consideration July 2009 Rich Kennedy, Research In MotionSlide 8 Bandwidth Time Area Bandwidth, Area and Time are primary considerations Two systems interfere if their Bandwidth overlaps Two systems interfere if they transmit at the same Time Two systems can interfere if they are located in the same Area

9 doc.: IEEE 802.18-09/0075r0 Submission First Attempt at a Formula for MU July 2009 Rich Kennedy, Research In MotionSlide 9 BW / 83.5 MHz Duty Cycle Power/100mW MU= (BW/83.5MHz)  DC  (P/100mW ); MU<[4%] Duty Cycle represents the time a system is active BW/83.5 MHz is the fraction of the 2.4GHz band utilized Power/100mW represents the fraction of maximum power

10 doc.: IEEE 802.18-09/0075r0 Submission Adjustments to the Formula During the June meeting the adjustments to the formula were discussed –Deployment Density should be included in the formula; NO –Industrial and Process Controls with alarms should have priority; NO –Manual blacklisting for frequency hoppers should be allowed; NO –The measure of Power should be TRP instead of EIRP; NO –Higher power for outdoor systems; sector – NO; pencil beam – YES –Bandwidth to be used; 6dBc – NO; 20dBc – YES –PSD is a better measure than Power; YES –Max. TXON time and min. TXOFF time must be considered –Bandwidth is not required; Power Density x Time is the best measure July 2009 Rich Kennedy, Research In MotionSlide 10

11 doc.: IEEE 802.18-09/0075r0 Submission Future TG11 Meetings It was decided that this work item will not be completed on schedule; chair will request an extension –Next meeting tentatively October 12 – 14, 2009 –After that – December 10 – 11, 2009 (following ETSI BRAN December 7 – 9) Next meeting will focus on test methodology and coming to a final agreement on the formula and maximum percentage for MU Plan is to complete the work in March 2010 July 2009 Rich Kennedy, Research In MotionSlide 11

12 doc.: IEEE 802.18-09/0075r0 Submission Recommendations for 802.18 IEEE 802.11 should work with 802.18 to develop an opinion on the formula and test methodology and submit it to ERM TG11#22 in October IEEE 802.11/18 members who are also ETSI members should attend the next two meeting to ensure that RLAN interests are properly represented (and voted) As this will become an ETSI regulation, we need to consider global impact, as many countries follow ETSI I recommend we request that comprehensive testing be required before adoption of the rule change July 2009 Rich Kennedy, Research In MotionSlide 12

13 doc.: IEEE 802.18-09/0075r0 Submission July 2009 Rich Kennedy, Research In Motion References ERM_TG11(21)22 - Notes of the 21st meeting of TG11 (ETSI membership required) Slide 13


Download ppt "Doc.: IEEE 802.15-09/0542r0 Submission July 2009 Dr. John R. Barr, JRBarr, Ltd.Slide 1 Project: IEEE 802.15 Working Group for Wireless Personal Area Networks."

Similar presentations


Ads by Google