Main Headquarters: 120 Water Street, Suite 350, North Andover, MA 01845 With offices in: NY, ME, TX, CA, OR www.ers-inc.com Standard Protocol for Non-Residential.

Similar presentations


Presentation on theme: "Main Headquarters: 120 Water Street, Suite 350, North Andover, MA 01845 With offices in: NY, ME, TX, CA, OR www.ers-inc.com Standard Protocol for Non-Residential."— Presentation transcript:

1 Main Headquarters: 120 Water Street, Suite 350, North Andover, MA 01845 With offices in: NY, ME, TX, CA, OR www.ers-inc.com Standard Protocol for Non-Residential Lighting Efficiency Measures Regional Technical Forum Meeting August 21, 2012

2  Introduction  Project status  Project participation  Protocol revisions since last RTF meeting  Remaining issues Agenda

3  Kick off meeting held - March 9 th  Work plan developed – March 21 st  Review memo distributed – April 20 th  Draft protocols posted for review May 10 th  Subcommittee discussion on Draft – May 16 th  Revised Protocol posted – June 27 nd  Lighting subcommittee review – July 3 rd  Protocol update for Subcommittee – July 17 th  Lighting subcommittee review – August 7 th  Protocol to RTF for decision – August 21 st Project Status Review

4 Project Participation RTF StaffMarch 9May 16July 3August 7 Grist, CharlieXX Charles, Gillian Eckman, Tom Kendall, MarkXXXX Hadley, AdamXX O'Neil, NickXXXX Contractor (ERS) Brian McGowanXXX David ReynoldsXXXX Chris SmithX Dan BirleanuX Gavin GuiXX Todd WinnerX Stephen AchillesXX

5 Project Participation Subcommittee Members March 9May 16 July 3 August 7 Andy Baker Mike Baker X Bing TsaoXX Bobbi Wilhelm Corky Clark X Cory Read Craig Cirany Crispin Wong Curt Flores Danielle Gidding XX David Thompson X X XX Dawn DoberenzX Elaine Miller Eric BratengXXXX Graham Parker Jay Himlie X X Joseph Vaccher XXX

6 Project Participation Subcommittee Members March 9May 16 July 3 August 7 Don Jones Jr.XXXX Lauren Gage My K TonXX Peter MeyerXX Ray Hartwell XXX Rich Arneson XXX Roger PeeryXXXX Roger SpringXX X Spencer MoersfelderX Tom Eckhart Tom LeinhardXXX Travis ReederX John WilsonXXXX Ken Keating X Angela PilantX Shani TahaX

7  Incorporated Guidelines language for current practice and pre- conditions baselines  Sunset date set to 9/30/2015  Baseline lighting fixture data table added to calculator  Clarifications to site and program sampling  Clarifications to provisional data collection requirements  Added option for determining HVAC interaction effects Protocol Revisions Since July 17 th A number of revisions were made to address RTF member input, including:

8  Need research plan to address regional sample data required to prove protocol  Baseline selection needs clarity  Provisional data collection  Monitoring duration  Use of current or lighting loggers – further specificity or left to professional judgment of practitioner  RTF HVAC interaction by building and fuel type has limited granularity (factors by climate zone not currently available) Remaining Issues