Download presentation
Presentation is loading. Please wait.
1
Strategic Plan Todd Skiles – dtoddskiles@gmail.com
2
Webelos Camps are the single most popular program at Goshen. They sell out each year. Key to long-term retention and growth. Existing Program Gear is showing age. ◦ “ ‘yaks have cracks” Proposal Assumes: ◦ Maintaining current camps. ◦ Same approach at both camps allowing for customization by staff.
3
Tier 1 Level – Purchases with focus on long- term maintenance. Tier 2 Level – Construction Projects Tier 3 Level – Managerial and Service
4
2013 ◦ Telescopes - $4,000 2 Dobsonian and 2 Refractors each per camp. (8 total) ◦ Compound Bows - $2,500 (10 per camp) ◦ Kayaks, 10 per camp - $9,000 ◦ Tools for both camps - $4000 2014 ◦ Rowboats with oars/locks - $5,000 (phase 1) 2015 ◦ Return of “The Blob” - $13,000* ◦ Rowboats Phase 2 - $5,000* *Dependency on Tier 2 Construction
6
2013 – Not Feasible ◦ Expand PMI Parking - $4000 2014 ◦ Expanded Aquatic Frontage - $75,000 ◦ Theme Area Construction (the “set”) - $60,000 ◦ Additional field areas - $45,000 ◦ Exhanced Shooting Pavilions – Archery - $50,000 2015 ◦ Second Dock - $30,000 ◦ Additional Pavilions (4 total, 2 powered) - $150,000 ◦ Expanded Shooting Pavilions – BBs - $50,000 *rough estimates only – needs better cost analysis
7
2013 – can a slight mod be made with the team building the spillway to clear additional space at PMI for parking? Ross needs a permanent archery facility rather than just canopies.
8
Recommend one electrified pavilion at both PMI and Ross to support Nature. ◦ Could include aquariums, cold storage for bait, etc. ◦ Convert existing Nature Pavilion at Ross to other program. ◦ Existing PMI Pavilion could be modified. ◦ Consider Nature next to lake to support fishing program and use the secondary docks proposed.
10
2013 ◦ Expand waste management contract to include recycling – approx $500 per camp for the season. ◦ Discretionary Income for Camp Staff – improve flexibility to address program needs. $500 per year per camp to start. 2014 ◦ Expand camp to 7 weeks ◦ Or build a third Webelos Camp ◦ Additional weeks bring in additional revenue ◦ Partnership programs reach whole new sources of revenue and promote staff opportunities
11
Recommendation201320142015 Cost TOTAL $ 24,500.00 $ 236,000.00 $ 249,000.00 $ 501,500.00 Tier 1 - Purchases Telescopes $ 4,000.00 Kayaks $ 9,000.00 Iceberg $ 13,000.00 Compound Bows $ 2,500.00 Tools $ 4,000.00 New rowboats – smaller, more age appropriate $ 5,000.00 $ 10,000.00 Tier 2 - Construction PMI Parking$ 4,000.00 Expand Aquatics Frontage $ 75,000.00 Second Dock $ 30,000.00 Theme Areas $ 60,000.00 Additional Program Pavilions $ 150,000.00 Additional Field Areas $ 45,000.00 Dining Hall Expansion Expanded Shooting/Archer Pavilions $ 50,000.00 $ 100,000.00 Tier 3 - Managerial Expand to 7 weeks x x Income Recycling Program $ 1,000.00 Annual Fee Discretionary Spending for Camp Staff $ 1,000.00 $ 3,000.00
12
Better alarm system for both camps – not electrical. Improved electrical system at Showerhouses Improved drainage within Showerhouses Improved electrical systems in Staff Site Laundry Facilities at PMI Repairs and better structure behind PMI campfire site
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.