P&L Reporting
2
P&L Reporting Format
3
P&L Policy Decisions & Definitions
Labor Charges: Labor costs will be charged to each deployment P&L based on actual time as reported through Wind2. Hours will not be smoothed The following rates will be applied: Back-Office Charges: Effective January 1, 2004 “Back Office” charges will be based on actual time as reported by staff. Prior to 1/1/04 we will apply 15% of total labor costs to P&Ls as back-office charges Reporting: Project P&L reports will be produced once each month using a standard SSA P&L format (see attached). NOTE: P&L reports can not be produced until all time reporting is complete. It is the EC’s responsibility to ensure time reporting is completed on a timely basis. This includes Subcontract personnel. Sales, General & Administrative expense allocation: SG&A costs are applied to projects based on a percentage allocation. The Controller will review SG&A percentage (burden rate) annually. If appropriate the SG&A rate will be modified. This review will typically occur in January each year, exceptions will apply based on circumstances. A deployment will use the SG&A rate in effect at the time the deployment is initiated (contract signed). The SG&A rate will remain constant for the duration of the deployment. The SG&A Rate is determined based on all labor categories (Employees, Subcontractors, etc.) When applied to the P&L, SG&A is applied against all labor categories (Employees, Subcontractors, etc.). Financial reports are sensitive proprietary material and should be treated accordingly. Distribution should be no go beyond the EC & DM and never to someone who is not an SSA employee. Category Hourly Rate Finance 90 Executive Consultant 130 Deployment Manager Sr. Staff 155 Master Consultant 85 Subcontractor 220 Back Office 35
4
Automate (via Wind2) 2Q, Rollout to Other Deployments Post-Automation
P&L Roll-Out Initial Design Meeting (1/6/04) Develop report format, extract initial data (1/7 – 1/31) Review with ECs (January) Review with Leadership Team (2/11) Finalize process, format, data (2/12) First reports (Tyco, IKON, WEC) (2/18) Review P&Ls with ECs using January actuals (2/20) Automate (via Wind2) 2Q, Rollout to Other Deployments Post-Automation
5
Deployment Review Conference Calls
6
Westinghouse – Breakthrough Value: Management Review 2/2/04
Engagement Terms Engagement Team Engagement Start Date September 2003 Engagement End Date April 2005 Engagement Duration (Mos.) 18 / 24 Month of Engagement/% 6 / 33% Start-Up Fee $300K BVS % 6% Mos. Of Benefits Measurement 24 Payment Cap N/A Position Current Needs Executive Consultant John Krupar Deployment Manager Paul Sandell Finance Katha Raulston MCs Karen Riding Ha Dao Ray Hemmele Tjerk Dijkstra 2 – GB Lean Jim Walker 1 Lean Expert Material Calendar Event Date Material Needed Submitted For Review Material Returned CFL Wave 1 – Week 5 2/15/04 2/2/04 1/15/04 2/3/04 CFL Wave 3 - Fastart 2/18/04 1/31/04 CFL Wave 2 – Wk 2 2/17/04 N/A MBB Training 2/19/04 2/5/04 Not Yet
7
Westinghouse – Breakthrough Value: Management Review 2/2/04
Deployment Performance Metric Budgeted (To Date) Completed Currently In Process Forecasted (Remainder of Engagement) # BB Projects Completed 4 1 75 900 Avg. BB Proj. Cycle Time (Mos.) 6/4 7 Avg. BB Proj. ($K Annualized) 250 1200 390 # BBs Completed Training # BBs Certified Certification Requirements: # BBs / Projects Washed-Out 2 / 4 Talking Points: Events Since Last Review: Steering Committee Meeting Functional Champion Training Upcoming Events: BB Wave 2 Requiring Attention: Change in Client Leadership Sale of Business Unit Resource Needs Material preparation Worthy of Note: Customer Satisfaction Black Belt Performance BB Performance
8
Financials Current Month P&L Year-To-Date (YTD) P&L
Program-To-Date (PTD) P&L
9
Deployment Review Conference Calls – Rollout Plan
Design content & logistics of process Review with ECs Review with Leadership Group Refine as needed (by 2/15) Distribute to ECs & DMs to begin data collection (by 2/18) Coordinate with Mary & train as necessary (by 2/20) Schedule first review (by 2/18) First review – after P&Ls ready (March 18th) Each month: Finance group Update P&Ls ECs/DMs complete Deployment Review report, to Mary 3 days before meeting Mary accumulates & distributes 2 days before meeting EC leads discussion
10
Finance Group – 2004 Priorities
11
2004 Priorities: Complete BVS Model, Optimize For Margin
Finance Group 2004 Plan Completing BVS Model Optimizing Complete BVS Model: Develop & field-test BVS processes at IKON First closed projects P&L Reporting Monthly Deployment Reviews Viability of S/T Projects (Alpharma) BVS Repeatability: Translate to WEC First WEC Invoice First Check (IKON) Close balance of IKON Wave 1 Projects BVS Optimization: Collect performance data ($ & time to close) Revise deployment performance expectations Analyze & advise ECs on deployment optimization Establish “Ops. Reviews” Contract Modifications: IKON – Extend to accommodate deployment pace WEC – Potential extension Drive SSA margin improvement form BVS deployments, little impact on 2004 1Q04 2Q04 3Q04 4Q04 2004 Priorities: Complete BVS Model, Optimize For Margin
12
Other Issues Responsible for, but not currently active on:
PowerSteering (Fillip currently working – short-term) Financial Training Project (Will start 2Q) Employee Retention Project (Will start 2Q) Case Studies (Worked-up example format/content for Novartis use … what is next step?) Supporting KT Engagements (No timing yet …) P&L and Deployment reviews beyond BVS engagements (no timing yet)