Download presentation
Presentation is loading. Please wait.
Published byLaura Thompson Modified over 9 years ago
2
Objectives STOP HUMIDITY DAMAGING THE CASTLE. BRING CONFORT FOR INHABITANT COST SAVING ON HEATING SYSTEM
3
TOTAL ROAD MAP: 15 weeks MONEY COLLECTION MANUFACTURING 7 WEEKS INSTALLATION 7 WEEKS
8
PRODUCT & QUALITY DIRECT FACTORY PRICE. WOOD FRAME WINDOWS WITH DOUBLE GLASS AND ARGON GAZ INSULATION
9
COST FOR 3 FLOORS 20 000€ including installation: –GROUND FLOOR: 10 WINDOWS + 2 DOORS –1 st floor: 16 BIG 2 PARTS WINDOWS –MEZZANINE: 7 SMALL WINDOWS
10
PROJECT CAN BE FOLLOWED ON CABELLA WORLD CENTER WEBSITE: –http://cabellaworldcenter.org/home/
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.