1 Notebook Activity JP CABRERA, MUNS Manager, Updated 10/04/2001
2
2 Notebook project 3 assumptions : –280 units/shift, only productivity increase –560 units/shift, capacity + productivity increase –840 units/shift, capacity + productivity increase Investments : Payback : Planning Annex 1 : stockroom improvement Annex 2 : production process improvement
3
3 THE 3 ASUMPTIONS
4
4 Simulated specifications :
5
5 Simulated investments and payback period :
6
6 INVESTMENTS
7
7 For 280 units / shift
8
8 For 560 units / shift
9
9 For 840 units / shift
10
10 Pay back
11
11 For 280 units / shift (release 2)
12
12 For 560 units / shift (release 2)
13
13 For 840 units / shift (release 2)
14
14 Capacity versus budget :
15
15 Schedule for the project:
16
16 Annex 1 : Stockroom improvement : - Current process - New process - Gains
17
17 Stockroom : description of the current process –step 1 : –Book of previous preparation (screen on MAPICS) –print current Manufacturing Order –print locating list of components –step 2 : pick first part of components –step 3 : pick expensive parts (CPU/RAM/HDD) –step 4 : pick components on the flow rack –step 5 : pick last part of the preparation –step 6 : prepare each tray on the conveyor
18
18 Stockroom : current situation Office Area 2 Flow rack Area 1 Prod NB Area 3.1 Area 3.2 Area 3.3 CPU room 1 2 3 4 6 5 Kitting This process is adapted to Mos of large quantities
19
19 Stockroom :description of the new process –step 1 : –print current Manufacturing Order –print locating list of components –step 2 : pick expensive parts (CPU/RAM/HDD) –step 3 : pick 1 component (PREKIT) –step 4 : pick components on the flow racks –step 5 : scans the preparation for booking
20
20 Stockroom : projected situation Office Area 1 Prod NB Area 3.1 Area 3.2 Area 3.3 Prekits CPU room 4 3 2 1 Area 2 No more Kitting 5 This process is adapted to Mos of little quantities (ATO/CTO)
21
21 Stockroom : picking loop Parameters: –the loop is 88 meters long –the operator needs 15 minutes per cycle: –2,5 minutes to prepare 1 unit –6 units picked at once –7 hours of work per shift => 28 cycles –THEN a warehouseman runs 2,5 kilometers per shift This value is normal : the law gives no limit in this case, because the load to carry is very low : 80 kg on an adapted trolley
22
22 Stockroom : Gains obtained First step : improving manual process = gain from 9’ to 4’ the gains are obtained by : –suppressing 1 operation : the kitting, gain 3’ –grouping components, gain 1’ –reducing the length of the picking way, gain 1’ Second step: opportunity to use the Pick to voice = gain from 4’ to 2’ the gains are obtained by : –improving quality by asking a checksum key at each step, –improving concentration of the operator on the picking itself –removing 3 steps : »printing of MO »printing of Locating list »booking in the system –simplifying the training = 1 hour instead of 2 days
23
23 Annex 2 : Production process improvement : - Current process - New process : - the cell - layout with 4 EAP - layout with 6 EAP - Gains
24
24 Production : Current Layout Prekits Flow
25
25 Production : the new cell
26
26 Production : new layout for 4 “EAP” (release 2)
27
27 Production : new layout for 6 “EAP”
28
28 Production : Gains obtained Only on a cell of 2 “EAP”, we gain 6,2 direct people in KITTING+ASSEMBLY+PACKING : –current process = 16,7 people –new process = 10,5 people
29
29 END