Download presentation
Presentation is loading. Please wait.
Published byEllen Long Modified over 9 years ago
1
Agenda Safety Schedule Machine and system reports 2/29/2016G. Robert-Demolaize, Time Meeting1
2
Safety and training Safety:Ed Lessard 2/29/2016G. Robert-Demolaize, Time Meeting2
3
Schedule Blue ramp development since 12/14 evening; beam ramped through Beta* = 1m, lost shortly after that, assumed to be orbit-based so far (under study right now). 2/29/2016G. Robert-Demolaize, Time Meeting3
4
Schedule Blue ramp development since 12/14 evening; beam ramped through Beta* = 1m, lost shortly after that, assumed to be orbit-based so far (under study right now). First Au beam in Yellow on 12/12, circulating on 12/13 after polarity switch on a quadrupole. RF capture achieved on 12/14. Still PS work needed before ramping. PS work now allows using the Au101, split transition time ramp file. Some components need to be check/attended to: Siemens, BPM’s, experiments => discussing an access day on 12/16. Current updated plan: physics probably delayed by 2-3 days from 12/22. 2/29/2016G. Robert-Demolaize, Time Meeting4
5
Machine and system reports RHICKevin Brown STARBill Christie PHENIXStefan Bathe 2/29/2016G. Robert-Demolaize, Time Meeting5
6
Machine and system reports MaintenancePaul Sampson 2/29/2016G. Robert-Demolaize, Time Meeting6
7
2/29/2016G. Robert-Demolaize, Time Meeting7 Next Time meeting Next Time meeting on Dec. 22 nd
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.