Download presentation
Presentation is loading. Please wait.
Published byAlexander Brown Modified over 9 years ago
1
MICE Phone Meeting 26 October 20061 Status report of Waveguides for Station5 Hideyuki Sakamoto Contents Review of production process Present status Plans
2
MICE Phone Meeting 26 October 20062 Review of production process 1.Cut 2.Assembly with testing cookie 1.All connectors are set in fiber bundle ( including internal&external ) 2.Mapping is completed at this step. 3.Polish 4.1 st transmission test 5.Cutting testing cookie away 6.Glueing and making internal.& external. separately. 7.Polish 8.2 nd transmission test 9.Shipping to FNAL toward final polishing. -> Imperial College.
3
MICE Phone Meeting 26 October 20063 Status at step 2 … D0 connector Testing cookie Elastic bands Station connector External region Internal region Table
4
MICE Phone Meeting 26 October 20064 Present Status ~ From discussions with Goto san (G-tech Ltd.) ~ Q. “ How is status of cutting fibers? ” A. “ In the middle of cutting. We are waiting for remaining connectors ” Q. “ How long does it take to finish making the modules(5 in total)? ” A. “ About 1 week for the first module, and another 2 weeks to complete. Q. “ How is the production process planed? ” A. “ I think it will work. It should be checked after making first module. ”
5
MICE Phone Meeting 26 October 20065 Plans Station connector (MICE connector) from Geoff will arrive at G-Tech: 31 October (Tuesday) All connectors will arrive at G-Tech: Beginning of November? Assembly with testing cookie: Transmission test: –Now, takatomi is confirming final result of the way of the test. Place to be tested is now adjusting. @ G-Tech or Osaka Univ.? First module will complete : Middle of November? Production assessment test : –Checking the stress on fibers by eye or by hand & damage (crack) from the result Of transmission test. Completing the remaining modules ( 4 modules ) : End of November? ~1 week ~2 weeks
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.