1 Tracking tests – Analysis results October 2007 Campaign Panagiota Xydi Acknowledgements: to all FIDEL team Cern, December 09, 2007 AT-MTM.

Similar presentations


Presentation on theme: "1 Tracking tests – Analysis results October 2007 Campaign Panagiota Xydi Acknowledgements: to all FIDEL team Cern, December 09, 2007 AT-MTM."— Presentation transcript:

1 1 Tracking tests – Analysis results October 2007 Campaign Panagiota Xydi Acknowledgements: to all FIDEL team Cern, December 09, 2007 AT-MTM

2 2 Results – B2/B1 ratio SSS064 – MB2624 Condition  (B 2 /B 1 ) nominal performance± 6 x 10 -6 Commissioning with low intensity beams ± 1.8 x 10 -4 Tracking tests – Analysis Panagiota Xydi 1/3

3 3 Results – B2/B1 ratio SSS064 – MB2598 Tracking tests – Analysis Panagiota Xydi 2/3

4 4 Results – B1/B1 ratio MB2624 – MB2598 Condition  (B 1 /B 1 ) nominal performance± 1 x 10 -4 Tracking tests – Analysis Panagiota Xydi 3/3

5 5 Tracking tests: Data Processing Offset removal (using linear interpolation of the offset with current ) rms Mean value MB: ~ 0.2 mV rms ~ 0.08 – 0.1 mV SSS: ~ 1 mV rms ~ 2 mV Tracking tests – Analysis Panagiota Xydi 1/3 offset mean value at flat bottom offset mean value at flat top

6 6 Tracking tests: Data Processing Calibration of fixed- coil measurements with rotating coil measurements (1 st point, slope) 2/3 Tracking tests – Analysis Panagiota Xydi

7 7 Tracking tests: Data Processing The case of the SSS 3/3 Tracking tests – Analysis Panagiota Xydi


Download ppt "1 Tracking tests – Analysis results October 2007 Campaign Panagiota Xydi Acknowledgements: to all FIDEL team Cern, December 09, 2007 AT-MTM."