Download presentation
Presentation is loading. Please wait.
Published byEustacia Scott Modified over 8 years ago
2
USGS ACTIVITY: Estimating suspended-sediment load continuously for 2 years using turbidity *, hydroacoustic, and LISST instruments, all proxy technologies for suspended-sediment concentration * Turbidity measurements funded by National Park Service
3
Hydroacoustic Instrument Installation
4
Sediment-Gage Installation
5
ADVM LISST-25 DTS-12; Turbidity (NPS funded) Sediment Monitoring USGS station no. 12046260
6
Bike path from where suspended-sediment samples are collected
7
Measuring Sediment Transport during Floods: one of the bigger project challenges
8
USGS gaging station #12214350 Sumas River at South Pass Road at Nooksack, WA
9
Sediment Monitoring with Surrogate Sediment Instruments DTS-12 Analite 180 Argonaut SW ISCO DTS-12 ISCO DTS-12 Preliminary results subject to change [Telegraph Road] [South Pass Road] [Massey Road]
10
Instrument deployment at Telegraph Road
Similar presentations
© 2025 SlidePlayer.com. Inc.