1 POTENTIAL EN-MME DESIGN JOBS IDENTIFIED BUT CURRENTLY NO REQUEST FROM EQUIPMENT OWNERS TO EN-MME EDMS 1486468 B.RIFFAUD On behalf of EN-MME design team LIU-PLI Meeting – 25/02/2015

2 LIU - PSB BT-BHZ10 & BTM-BHZ10 →Owner : J.Hansen. →Request : Design of new Y and V chambers. →Design kick-off : 2 rd quarter 2015. →Estimated MME resources : to be defined. BR-16L1 (kicker) →Owner : J.Hansen. →Request : Design of a new chamber. →Design kick-off : 2 rd quarter 2015. →Estimated MME resources : to be defined. LIU-PLI Meeting – 25/02/20152

3 LIU - PS BMP42 (bumper) & SMH42 (septum) →Owner : M.Hourican. →Request : Design of a new bumper/septum system + vacuum device. →Design kick-off : 3 rd quarter 2015. →Estimated MME resources : 2015 (1 FTE), 2016 (0.5 FTE). MSIV (septum) →Owner : M.Hourican. →Request : Design of a new MSIV magnet. →Design kick-off : 3 rd quarter 2015. →Estimated MME resources : to be defined. LIU-PLI Meeting – 25/02/20153

4 LIU - SPS ZS →Owner : B.Balhan. →Request : Beam losses at high energy level (electron cloud and electrical issues). Improvement of pumping system, impedance reduction, improvement of ion trap connections, short-circuiting of anodes. →Design kick-off : Inter-tank definition : 1 st /2 nd quarters 2015. BI integration : 3 rd quarter 2015. ZS4 preliminary design : 2nd quarter 2015. →Estimated MME resources : to be defined. LIU-PLI Meeting – 25/02/20154

5 LIU - SPS TPSG4 & TPSG6 →Owner : B.Balhan. →Request : Replacement of TPSG4 & 6 by more robust versions for MSE protection (increase of length, similar version as TCDQ for TPSG6). →Design kick-off : to be defined. →Estimated MME resources : 2015 (0.5 FTE / TPSG4, 0.5 FTE / TPSG6) TPST →Owner : B.Balhan. →Request : to be clarified. →Design kick-off : not before 2017. →Estimated MME resources : to be defined. LIU-PLI Meeting – 25/02/20155

6 LIU - SPS TIDVG (new core) →Owner : O.Aberle. →Request : Replacement of present TIDVG core with improved version (robust enough for present and future LHC beams). →Design kick-off : 2 nd quarter 2015 →Estimated MME resources : to be defined. Vacuum sectorization LSS1 →Owner : P.Chiggiato. →Request : Addition of sector valves around TIDVG and MKP/D in order to reduce personnel dose, to protect sensitive equipment and to reduce pump-down time. →Design kick-off : to be defined. →Estimated MME resources : to be defined. LIU-PLI Meeting – 25/02/20156

7 LIU - SPS 200 MHz power upgrade →Owner : E.Montesinos. →Request : Design of supports (to be confirmed). →Design kick-off : to be defined. →Estimated MME resources : to be defined. SPS and TI2/TI8 protection devices →Owner : R.Losito. →Request : Replacement or extension of present TCDI system, with more robust collimators and improved protection. Displacement upstream in TI2/8 in order to reduce losses in LHC injection region. →Design kick-off : to be defined. →Estimated MME resources : to be defined. LIU-PLI Meeting – 25/02/20157

8 LIU - SPS New external High Energy Dump →Owner : B.Goddard, R.Losito. →Request : New dump block based on TED design in existing beam line, using existing extraction and new switching magnets (objective : dumping of high intensity LHC beam during setup). →Design kick-off : to be defined. →Estimated MME resources : to be defined. LIU-PLI Meeting – 25/02/20158

9 LIU - SPS 50ns (100ns ?) rise time kickers for ions →Owner : B.Goddard, J.Uythoven, T.Kramer,, R.Folch, B.Holzer, J.Hansen, M.Hourican. →Request : Addition of new kicker MKP (PFL in parallel to PFN), thin in- vacuum septum MSIV, dump, beam instrumentation and vacuum devices in order to allow injection of ions with 50ns rise time. →Design kick-off : to be defined. →Estimated MME resources : to be defined. LIU-PLI Meeting – 25/02/20159

10 LIU - Ions LINAC3 Oven test stand →Owner : D.Kuchler. →Request : Increase knowledge on oven behaviour. →Design kick-off : to be defined. →Estimated MME resources : to be defined. LINAC3 LBS →Owner : ? →Request : Energy measurement of LINAC3 beam : new spectrometer line after BHZ20 (modification or new spectrometer). →Design kick-off : to be defined. →Estimated MME resources : to be defined. LIU-PLI Meeting – 25/02/201510

11 LIU - Ions LINAC3 LEBT →Owner : J.Bellodi. →Request : Increase intensity in LINAC3/LEAR : Rematch optic in Low Energy Beam Transport. Design of new magnets to be confirmed. →Design kick-off : to be defined. →Estimated MME resources : to be defined. LINAC3 Source test stand (to be approved) →Owner : D.Kuchler →Request : New spare source. Source test stand for validation, tuning and Training. →Design kick-off : to be defined. →Estimated MME resources : to be defined. LIU-PLI Meeting – 25/02/201511

12 LIU - Ions LEIR Beam Stopper →Owner : I.V.Leitao. →Request : New Dump and Y vacuum chamber. →Design kick-off : 3 rd quarter 2015. →Estimated MME resources : 0.3 FTE (0.1 for dump, 0.2 for chamber). LIU-PLI Meeting – 25/02/201512

13 Conclusion No official requests were sent to EN-MME for these jobs. 0.3 FTE are already booked in EN-MME provisional planning (first half 2015) for PSB-BT-BHZ10, various BE-BI jobs & various LIU jobs. 2.3 FTE are planned in 2015 (second half) and 0.5 FTE are planned in 2016 for BPM42/SMH42/TPSG4/TPSG6 and LEIR Beam Stopper, but resources are not included in EN-MME provisional planning yet. Since EN-MME provisional planning is almost full for 1 st and 2 nd quarters 2015 (main activity for HL-LHC, AD/ELENA & LIU projects), it is really important to anticipate your request to EN-MME in order to get the best service possible in 2015. Request = Detailed Specification + Deadlines. LIU-PLI Meeting – 25/02/201513

14 Thank you for your attention