EMCal Meeting Nantes – July 15-17 2008 1 J-F Muraz Grenoble Status Assembly and test Hall.
2
EMCal Meeting Nantes – July 15-17 2008 2 J-F Muraz Grenoble Status Trigger support structure. - Done for Yale and Grenoble assembly sites.
3
EMCal Meeting Nantes – July 15-17 2008 3 J-F Muraz Grenoble Status Trigger light guides. - delivered. - Ready to be glued to scintillators produced by Yale
4
EMCal Meeting Nantes – July 15-17 2008 4 J-F Muraz Grenoble Status Test bench electronic setup. PMTDFC x32 … Delay ADCTDC VME NIM CAMAC EMCal FEE … Trigger module Transl. CCUSB DAQ/ PC Delay Analog splitter To be delivered
5
EMCal Meeting Nantes – July 15-17 2008 5 J-F Muraz Grenoble Status DAQ. - DAQ installed by Terry and David last week
6
EMCal Meeting Nantes – July 15-17 2008 6 J-F Muraz Grenoble Status 4 SM Platforms: - Done. - Successfully load tested and certified. - Delivery expected next week. (after painting!)
7
EMCal Meeting Nantes – July 15-17 2008 7 J-F Muraz Grenoble Status Strip handling tools. - By the end of July, I will send to YALE: - 1 Strip handling tool fully equipped. - 1 Strip handling tool support frame. - all trigger scintillator support and positioning structure.
8
EMCal Meeting Nantes – July 15-17 2008 8 J-F Muraz Grenoble Status Strap Foils. - 3600 precutted (Full EU production : 3 SM) - 1200 machined and cleaned (1 SM) Hand precutting station Final cleaning Wire cutting operation (80 straps stack)