Download presentation
Presentation is loading. Please wait.
Published byShanon Foster Modified over 9 years ago
1
GÉANT developments and Year-3 Technical Roadmap Roberto Sabatino TF-NGN Berlin, 1-2 July 2002
2
IL FR CHIT LU BE NL DE IE SE PL CZ SK HU ATRO SI HR CY GR UK ES PT EE LV LT 10Gbps 2.5 Gbps 34 - 622 Mbps Topology
3
New since April 2xSTM-4 to Zagreb under test STM-1 IL-NL in place, IL-IT under test Malta contract being finalised
4
tender for connectivity to Ireland 9 responses to tender evaluation taken place 1st set of meetings with bidders 8-9 July wide ranges of capacities on offer
5
The (ill) health of carriers GEANT not affected by teleglobe nor worldcom KPNQ impact on Commodity IP (DWS) and N.A. research connectivity
6
GÉANT UK DE 60 Hudson 111 8th Ave. Abilene router Abilene switch GÉANT/ GTRN ESNET 2.5G Canarie 622M GE 622M ITN KPNQ NORTH AMERICAN RESEARCH CONNECTIVITY
7
GÉANT UK DE 60 Hudson 111 8th Ave. Abilene router Abilene switch GÉANT/ GTRN ESNET 2.5G Canarie 622M GE 622M ITN NEW NORTH AMERICAN RESEARCH CONNECTIVITY AT Level-3 DeTe
8
N.A. KPNQ connectivity replacement 3xSTM-16 complete on EU side, almost done in 60 Hudson QWEST taking over existing NYC connections previously provided by KPNQ Have in place an STM-4 between Abilene and DE for emergency backup UK and SE now use GEANT
9
FR CHIT LU BE NL DE IE SEPL CZ SK HU AT SI UK ES HR RO GR CY PT IL 2.5 Gbps 622Mbps 2.5 Gbps 622Mbps 2.5Gbps LU EE LT LV PL CZ HU SI GR
10
DWS (Commodity IP) KPNQ service replaced by Telia in UK, DE under test now “emergency” service provided to ACONET, CESNET and maybe SANET
11
Y2 Deliverables D13.2 Y3 Roadmap due 31 July D9.6 IPv6 tests 31/8 D9.7 measurement 31/8 D9.8 capacity management 31/8 D9.9 LBE 31/8 NEW Review Panel (E. Valente, D. Vandromme, S.Starzak, V. Maglaris) need outline 2-3 weeks in advance.
12
Y3 technology roadmap Network monitoring tools, specification and deployment of intra/inter domain (QoS) monitoring infratsructure. To include SW developments which can be done in co-operation with other initiatives user to user performance analysis, using real applications (streaming, video-conferencing) Definition of organisation of a PERT, sample implementation
13
Y3 technology roadmap cont. Optical developments, in consultation with other FP5 and FP6 initiatives. Study of components for future GEANt and NREN networks: 40Gbps 10GE G-MPLS AA architecture: co-ordination with other task forces. Study of implementation issues for GEANt and NRENs. Sample implementations and final recommendation
14
Y3 technology roadmap cont. Multicast: history feature for beacon, experimentation with high capacity streams, SSM, per-group monitoring, setting up of a multicast user expertise group (part of PERT ??) ipv6: migration steps for GEANT/NRENs, dual stack router performance, MIBS support for other projects (including “L2” support)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.