23 September 2010 Casablanca, Morocco CALICE Collaboration Meeting Hassan University HASSAN II 1 Towards Ecal Assembly Julien Bonis bonis@lal.in2p3.fr
2
23 September 2010 Casablanca, Morocco CALICE Collaboration Meeting Hassan University HASSAN II 2 Ecal assembly main steps ASU ensemble assembly Kapton HV gluing and Slab’s elements stacking Slab locking Cosmic bench Modul integration
3
23 September 2010 Casablanca, Morocco CALICE Collaboration Meeting Hassan University HASSAN II 3 Hall requirement : Enough surface (arround 60m2) Strong floor to support heavy object Large access Relatively clean Handling equipment Electrical power
4
23 September 2010 Casablanca, Morocco CALICE Collaboration Meeting Hassan University HASSAN II 4 Hall present state (hall 051:47m2 and hall 051+ hall 059:64m2) LAL allocated facilities for Ecal
5
23 September 2010 Casablanca, Morocco CALICE Collaboration Meeting Hassan University HASSAN II 5 Exterior view of entrance with hoist rail Interior view of Exterior door and hoist rail
6
23 September 2010 Casablanca, Morocco CALICE Collaboration Meeting Hassan University HASSAN II 6 Interior view of Exterior door and wall to 2nd room One’s back to exterior door Other side wall : Room 059 Room 059 window
7
23 September 2010 Casablanca, Morocco CALICE Collaboration Meeting Hassan University HASSAN II 7 Main room (051)
8
23 September 2010 Casablanca, Morocco CALICE Collaboration Meeting Hassan University HASSAN II 8 Required works Clearing and cleaning Walls coating and painting Revision of electrical installations. Checking hoist rail Phone and network wiring Exterior door repair or change Plastic curtain installation Interior door installation (If enlargement to the adjacent room accepted). Installation of a heating in 059 room Required fitting ASU assembly area Slab 1 area (elements stacking, kapton HV) Slab 2 area (Slab locking) Cosmic bench Module integration area Storage and equipment area
9
23 September 2010 Casablanca, Morocco CALICE Collaboration Meeting Hassan University HASSAN II 9 Roll hoist ASU assembly HV kapton gluing, Slab elements stacking Slab locking area Modul area Cosmic bench Cupboard for Storage and equipment Equipment Fitting Plastic curtain
10
23 September 2010 Casablanca, Morocco CALICE Collaboration Meeting Hassan University HASSAN II 10 The next LAL infrastucture meeting be held mid-october : Objective at the beginning of the works in november. We expected start fitting at beginning year 2011. Schedule