Caltrans Bridge Construction Forum 2007
Structure Materials Bill Corn Balfour Beatty Construction Ken Bocchicchio California Department of Transportation
2
Structure Materials Suppliers - What’s good or bad?
Pre- qualification – Can there be more? QC/QA Paperwork - Shortage of Materials and Suppliers
3
What is good or bad as a supplier for Caltrans?
Is payment timely? Are specifications consistent? Would additional material indexing on long-duration projects reduce risk and cost? Have new specifications impacted suppliers?
4
Pre qualification What procedures should be pre-qualified?
CIDH, Welding, Yellow Paint Removal? What materials should be pre-qualified? Concrete, asphalt, rock, cure? What plants/shops should be pre-qualified? Sign structure fabrication, pipe pile, light and signal poles?
5
QC/QA Paperwork Caltrans is moving toward the contractor being responsible for quality assurance. Caltrans is moving away from method specifications and moving toward performance specifications.
6
“Tagging” QC/QA Paperwork Caltrans materials release process Timing
Transfer Between Projects Certificate of compliance to allow acceptance on site
7
QC/QA Paperwork Are requirements clear?
Is there too much paperwork required? Is the ownership of the acceptance clear? Which materials or operations do contractors want to provide QA?
8
Shortage of materials and suppliers
Why? Because Caltrans is not the owner of choice? Because the volume of work available nears the maximum capacity of suppliers? Limitations on raw material?
9
WHAT ARE THE ISSUES? Late payment Late material delivery
Incorrect QA/QC paperwork Acceptance concerns
10
SOLUTIONS ?