Download presentation
Presentation is loading. Please wait.
Published bySuzan Lynch Modified over 8 years ago
1
Introduction to SIS 2009 ICH User Group James Shannon, IATA
2
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS2 Goal & Agenda Project Overview The Need For IS Vision IS Solution & Features Benefits & Changes Next Steps To familiarize you with Simplified Interline Settlement and prepare you for tomorrow’s breakout sessions
3
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS3 Questions (Hidden slide) What’s your familiarity with IS? (never heard of, little, etc) Were you briefed before coming here? What’s your role within your airline? (Finance only, Revenue Accounting) What’s your familiarity with Revenue Accounting? (IS-IDEC, etc)
4
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS4 Project Overview
5
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS5 Interline Settlement - Today ICH ATPCO (incl F&F pre IDEC Validation) Billed Entity Billing Entity Cargo IDEC File (monthly) Pax IDEC File (monthly) F12 – (weekly) F1 – net amounts of inv F2 - summary Cargo IDEC File (monthly) Pax IDEC File (monthly) F3– (weekly) Paper invoices, with coupon listing, coupons, rejects, supporting documents (monthly) AIA F&F F&F: receives NFP value ARC-Compass (NFP storage) Previously released sales record prorate engine prorate engine GDSs BSPs ACH Recap sheets - weekly Settlement sheets – (weekly)
6
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS6 SIS Vision Fundamentally change, simplify and integrate the interline settlement process, delivering tangible financial benefits to the industry. Invoices are electronic and not backed by paper Prime passenger billings do not require paper invoices or coupon listings IDEC formats are maintained with increased record types Passenger rejects, including any attachments, are submitted electronically without paper Cargo and Mail billings are electronic and paperless Miscellaneous billings (including any supporting information) are electronic, whether as data or with attachments Settlement action directly from ET systems is enabled
7
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS7 SIS Phase 3 Phase 1 Feasibility Phase 2 Requirements Development Phase 3 Implementation Phase 1 – Feasibility followed FC96 in May 2007 Phase 2 – Requirements Development ran from December 2007-July 2008. Included the initial RFI Phase 3 was too large to handle as a single operation, and was split: Phase 3a became the RFP and selection process, from which the Kale/iPayables proposal was chosen Phase 3b is the current System Design and requirements finalisation phase Phase 3c is the System Development and Pilot testing
8
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS8 Phase 3 - Steering & Working Groups Airline participation has been essential to the progress that SIS had made: Steering Group Passenger WG Cargo WG Miscellaneous WG IT WG Over 60 participants from over 30 carriers ICH Operations WG
9
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS9 IS Solution & Features
10
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS10 Interline Settlement - Today ICH ATPCO (incl F&F pre IDEC Validation) Billed Entity Billing Entity Cargo IDEC File (monthly) Pax IDEC File (monthly) F12 – (weekly) F1 – net amounts of inv F2 - summary Cargo IDEC File (monthly) Pax IDEC File (monthly) F3– (weekly) Paper invoices, with coupon listing, coupons, rejects, supporting documents (monthly) AIA F&F F&F: receives NFP value ARC-Compass (NFP storage) Previously released sales record prorate engine prorate engine GDSs BSPs ACH Recap sheets - weekly Settlement sheets – (weekly)
11
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS11SIS – Materials – RA42 Breakout Interfaces & Validation11 Integrated Settlement Billed Entity Integrated Settlement Billing Entity Overall Processes Billing & Invoicing Processes Central Repository “Digital Signature” Company Overall Processes Settlement Processes ICHACH Processes at time of Sales NFP engine ARC COMPASS™ Prorate Engine IS-WEB IS-XML IS-IDEC Usage File IS-WEB IS-XML IS-IDEC
12
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS12 No F12 files. No recap sheets, either. Nothing that you submit to the ICH or ACH today can be submitted after migration.
13
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS13 Main Features of IS File Formats & Validation Passenger Time of Sales – NFP final, NFP non-final, and Own Prorate Storage Value Determination & Autobilling Sampling (remove) Correspondence Audit Trail Differences for Cargo Differences for Miscellaneous Bringing It All Together Member Administration Processing Dashboard Document Storage
14
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS14 File Formats & Validation
15
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS15 File Formats Billed Entity Integrated Settlement Billing Entity Enabling Processes Billing & Invoicing Processes Central Repository “Digital Signature” Company Enabling Processes Settlement Processes ICHACH Processes at time of Sales NFP engine ARC COMPASS™ Prorate Engine IS-WEB IS-XML IS-IDEC Usage File IS-WEB IS-XML IS-IDEC Send files (or enter online) Receive (or download) invoices Validation Format Conversion Format Conversion: Billed Entity’s choice of format does not depend on the billing carrier’s
16
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS16 Input & Output Formats (Hidden Slide) Files (upload & download) IS-IDEC IS-XML IS-WEB Others – Usage File for Pax All contain same fields for a given record type Billing carrier can use any format at any time (“input combination”) Billing carrier’s choice doesn’t affect billed carrier (“format conversion”) Available formats depend on functionality (see e.g. Misc)
17
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS17 File Formats – IS-IDEC No longer data exchange file, but rather used to create an invoice and settlement file Similar to IDEC, with enhancements: Existing fields made mandatory (source codes, etc) New records added (Rejection Memos, tax breakdowns, etc) New fields added (for e-billing, additional info, etc) Unnecessary records / fields removed (batch total records, etc) 500 byte records (instead of 160 byte) Every carrier will need system enhancements to support IS-IDEC
18
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS18 File Formats – IS-XML New XML format for Integrated Settlement Based on IATA Aviation Invoice Standard, used by IATA InvoiceWorks Identical fields and validation requirements to IS-IDEC Every carrier will need to make system enhancements to support IS-XML IS-IDEC vs. IS-XML is an IT decision – it is immaterial to the RA department Potential Benefits of IS-XML IS-XML format is more flexible and thus better than IS-IDEC for variable record structure (like Miscellaneous billings) Potential Benefits of IS-IDEC Relatively little system development for carriers with a sophisticated IDEC solution in place already IS-IDEC format is more efficient (processing, storage, and internet bandwidth) than IS-XML for a fixed record structure
19
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS19 IS-WEB Record Structure Web-based user interface to create and receive invoices and records Identical fields and validation requirements to IS-IDEC and IS-XML Validation in real-time minimizes possibility of later validation errors Potential Benefits The web interface is hosted by IATA, so no system development is required by carriers Potential Negatives More internet bandwidth will be required than file formats, and the connection will have to be stable Won’t be as user-friendly as a dedicated, local system Not an alternative to a Revenue Accounting system
20
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS20 IS-WEB For Everybody IS-WEB is also used for other web-based services Audit Trail Pax & Cargo Correspondence Online Corrections after validation failure Processing Dashboard Airline profile updates Web Analysis Reports View and print invoices in a standard format Extensive user access controls (your company’s administrator can grant detailed permissions)
21
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS21 Breakdown Records Breakdown Records have been added where necessary to provide for detailed, possibly repeating, data or to provide for large amounts of text In PAX invoices, a coupon can have 0 or more tax breakdown records, each detailing a tax type and amount In Misc invoices, a “Ground Handling – Cleaning” line item contains a breakdown of line item detail records which show aircraft and route information
22
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS22 Example Breakdowns (Pax Rejection Memo) (Hidden Slide) Rejection Memo (SFI = 21) Reason Breakdown (SFI = 31) Reason Breakdown (SFI = 31) Coupon Breakdown (SFI = 32) Coupon Breakdown (SFI = 32) Coupon Breakdown (SFI = 32) Tax Breakdown (SFI = 33) Tax Breakdown (SFI = 33) Tax Breakdown (SFI = 41) VAT Breakdown (SFI = xx) VAT Breakdown (SFI = xx) VAT Breakdown (SFI = 34)
23
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS23 Example Breakdowns (Simplistic Misc Invoice) Invoice Invoice Header Line Item Tax Details Line Item Detail Attachment Aircraft Details
24
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS24 Validation Billed Entity Integrated Settlement Billing Entity Enabling Processes Billing & Invoicing Processes Central Repository “Digital Signature” Company Enabling Processes Settlement Processes ICHACH Processes at time of Sales NFP engine ARC COMPASS™ Prorate Engine IS-WEB IS-XML IS-IDEC Usage File IS-WEB IS-XML IS-IDEC Send files (or enter online) Receive (or download) invoices Validation Format Conversion Validation: Guarantees links between records (e.g. 2 nd and 1 st RMs, Misc “referenced invoice #”) Enforces timeframes and “order” (1 st RM -> 2 nd RM -> 3 rd RM) Ensures file is properly formed Other validations
25
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS25 Validation (Hidden Slide) Validation will be necessary in the Integrated Settlement environment as quality data is essential: No paper invoice or “back up” to determine what the electronic data means Uploaded data is no longer a data exchange file in support of a paper invoice, but rather the base for invoicing and settlement Billed entity will always be able to trust incoming data Some existing fields will continue to be passed through the system without validation for use on a bilateral basis
26
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS26 Examples of Validation Format Rules Ensures data types (e.g. numeric/alphanumeric), length, etc as defined Correct Values e.g. Settlement method cannot be “ACH” if both airlines are ICH-only members Mandatory Fields Line Item Net Price, Source Code, Ticket Issuing Airline, Coupon Number, etc Rejection & Correspondence Timeframes and Order Enforced 1 st RM 2 nd RM 3 rd RM Correspondence Mandatory Breakdown Records Are Present Tax breakdown records are present if coupon tax is populated and the breakdown record sums match the tax field Billing entity will be notified of validation results Invoices (and possibly files) failing validation will not go any further
27
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS27 Passenger
28
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS28 Time of Sales – Now (Optional) ATPCO (incl F&F pre IDEC Validation) Billed Airline Billing Airline Pax IDEC File (monthly) AIA F&F ARC-Compass (NFP storage) Previously released sales record prorate engine prorate engine GDSs BSPs Sales Records F&F: receives NFP value All: May receive sales records Optional Proration, Storage, Switching Sales Records, NFPs ICH F12 – (weekly) F1 – net amounts of inv F2 - summary F3– (weekly) ACH Recap sheets - weekly Settlement sheets – (weekly)
29
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS29 Time of Sales – With IS Billed Airline Integrated Settlement Billing Airline Enabling Processes Billing & Invoicing Processes Central Repository “Digital Signature” Company Enabling Processes Settlement Processes ICHACH Processes at time of Sales NFP engine ARC COMPASS™ Prorate Engine IS-WEB IS-XML IS-IDEC Usage File IS-WEB IS-XML IS-IDEC Sales Records, NFPs, & Sales Carrier’s Own Prorates Sales Records or Own Prorates Optional Proration (final & non-final), Storage, Switching
30
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS30 Neutral Fare Prorates – With IS (Hidden) NFP engine will be available to carriers for FIRST & FINAL™ (NFP Final) and non-F&F (NFP non-final) purposes NFP non-final could minimize rejections without any obligation by the carriers Own prorate storage and switching will allow the sales carrier to upload prorates, which are then forwarded or made available to the billing carrier
31
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS31 Time of Billing – Now ATPCO (incl F&F pre IDEC Validation) Billed Airline Billing Airline Pax IDEC File (monthly) AIA F&F ARC-Compass (NFP storage) Previously released sales record prorate engine prorate engine GDSs BSPs F&F: receives NFP value All: May receive sales records Pre-IDEC Validation for F&F NFP values (updates the PMI)
32
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS32 Submitting Billing Information – With IS Billed Airline Integrated Settlement Billing Airline Enabling Processes Billing & Invoicing Processes Central Repository “Digital Signature” Company Enabling Processes Settlement Processes ICHACH Processes at time of Sales NFP engine ARC COMPASS™ Prorate Engine IS-WEB IS-XML IS-IDEC Usage File IS-WEB IS-XML IS-IDEC Billing File / Data (similar to today) Billing Value Confirmation (Leaves “Original PMI”, updates “Value Confirmation PMI”) Billing File / Data (similar to today)
33
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS33 Time of Billing – IS Value Determination Billed Airline Integrated Settlement Billing Airline Enabling Processes Billing & Invoicing Processes Central Repository “Digital Signature” Company Enabling Processes Settlement Processes ICHACH Processes at time of Sales NFP engine ARC COMPASS™ Prorate Engine IS-WEB IS-XML IS-IDEC Usage File IS-WEB IS-XML IS-IDEC Usage File Prorate Values Billing File / Data (similar to today) Billing File / Data (similar to today)
34
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS34 Time of Billing – IS Auto-Billing Billed Airline Integrated Settlement Billing Airline Enabling Processes Billing & Invoicing Processes Central Repository “Digital Signature” Company Enabling Processes Settlement Processes ICHACH Processes at time of Sales NFP engine ARC COMPASS™ Prorate Engine IS-WEB IS-XML IS-IDEC Usage File IS-WEB IS-XML IS-IDEC Usage File Weekly Invoice Posting File Daily Revenue Recognition File No Billing File From Carrier Billing and Invoice Files Created Within IS Billing File / Data (similar to today)
35
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS35 Sampling (Hidden) Provisional Invoice (as today with prime coupon billing, but with elements from Forms A and B) Universe Adjustment (Form C) Digit Evaluation (Forms D and E) Form G (ACH) Rejection Memos & Correspondence (as today with non-sample but with elements from Forms F and XF) All via IS-IDEC, IS-XML, and IS-WEB
36
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS36 Pax & Cargo Correspondence Billed Airline Integrated Settlement Billing Airline Enabling Processes Billing & Invoicing Processes Central Repository “Digital Signature” Company Enabling Processes Settlement Processes ICHACH Processes at time of Sales NFP engine ARC COMPASS™ Prorate Engine IS-WEB IS-XML IS-IDEC Usage File IS-WEB IS-XML IS-IDEC Enter Correspondence (including attachments) Receive Correspondence (including attachments) Validation
37
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS37 Pax & Cargo Correspondence (Hidden) Correspondence can include an “authority to bill” flag which identifies when the authority to bill has been issued Not tied to settlement periods like transactions in Integrated Settlement – real-time and similar to e-mail but via IS-WEB interface Validation ensures no “cross-over” – correspondence can only be in reply to another correspondence (or 3 rd -stage RM) and cannot be out-of-order
38
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS38 Audit Trail & Rejection History With operational data being stored: Future records (e.g. rejections) don’t need supporting documents re-attached IS-WEB can be used to search and take action on previous billings: Search & browse through all records for which your carrier billed or was billed Drill down through tickets, coupons, tax breakdowns, correspondences, etc View audit trail of linked correspondences, rejections, and prime billings Find outgoing correspondences that haven’t been responded to Go directly to appropriate action (create RM, create correspondence, create billing memo)
39
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS39 Audit Trail (Pax example view) (Hidden) ActivityDateRecord / Supporting Docs 1 st Correspondence1 May$35; “I do not agree with your calculation…” 3 rd Rejection1 Apr$50; Long Explanation.doc 2 nd Rejection1 Mar$100; “See attached”; ticket.jpg 1 st Rejection1 Feb$100; “No coupon in our system” Prime Billing1 Jan$100 Create Correspondence
40
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS40 Audit Trail (Misc example view) ActivityDateDetails 2 nd Rejection1 MarInvoice #1290 Amount: $85 1 st Rejection1 FebInvoice #094834 Amount: $100 Original Invoice1 JanInvoice: #1284 Amount: $100 Create Rejection
41
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS41 Key Differences for Cargo & Misc
42
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS42 Key Differences for Cargo All cargo record types also represented in IS-IDEC, IS-XML, and IS-WEB The IATA e-freight project will introduce e-electronic formats (structured data) for these supporting documents over time Before then, carriers can bilaterally decide to use e-electronic formats, or to not transfer supporting documents at all
43
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS43 Key Differences for Miscellaneous IS-IDEC cannot be used for Miscellaneous billings (only IS-XML and IS-WEB) All Miscellaneous billings are uniquely defined by a charge category and charge code, allowing for routing to the correct person/department, automatic posting, or even automatic reconciliation Examples: Charge CategoryCharge Code GroundHandlingBaggage GroundHandlingCargo PartnerAllianceFF Miles ----
44
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS44 Bringing it Together
45
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS45 Bringing it All Together Member Administration will contain centralized preferences for your company: User Administration with the ability to create users and roles, customize user permissions Member Profile to set your own preferences, such as: Who to contact for ICH alerts, file validation failures, etc Rules as to how IS will operate for your company (apply digital signatures, allow corrections, etc) Processing Dashboard will provide a centralized overview of all submitted files and their statuses throughout the Integrated Settlement
46
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS46 Supporting Documents Supporting documents can be attached to most record types (including Pax Prime Billings, Cargo, Miscellaneous) Two types of supporting documents: Electronic Presentation - Supporting document that is digital but not in a defined and structured format. The document might be a PDF file or an image that a computer can read but not extract data from. E-Electronic Document – Supporting document that is in a defined and structured format which can be parsed by a computer. Example formats are IDEC, XML, or CSV.
47
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS47 Supporting Documents – With IS Billed Airline Integrated Settlement Billing Airline Enabling Processes Billing & Invoicing Processes Central Repository “Digital Signature” Company Enabling Processes Settlement Processes ICHACH Processes at time of Sales NFP engine ARC COMPASS™ Prorate Engine IS-WEB IS-XML IS-IDEC Usage File IS-WEB IS-XML IS-IDEC Batch Transfer e.g. FTP Batch Transfer e.g. FTP
48
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS48 Central Repository & Supporting Docs What? Any type of accepted supporting document (image, PDF, etc) How long? As long as the data is operationally required When? Before or after the associated record is uploaded (with “pending attachments” flag, which allows for notifications if not uploaded) How? Discussed in more detail during the Breakout Sessions
49
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS49 Benefits & Changes
50
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS50 Key Benefits of IS – Billing Carrier Substantial savings due to: Reduction in paper, postage and courier fees Reduction in internal paper handling and supply chain efforts No more loss of supporting documents and re-creation of invoices Automation of billing directly from uplifts (e.g. Auto-Billing) Optional à la carte service of “Integrated Settlement”
51
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS51 Key Benefits of IS – Billed Carrier Substantial savings due to: Reduction in internal paper handling and supply chain efforts (e.g. registration, and reconciliation of invoices to payment) Automated data Less manual intervention Data quality improvements on IS-IDEC Pax Rejection Memos, Billing and Credit Memo electronically Cargo Original AWB, Rejection and Charge Memo electronically Supporting Documents immediately available in electronic presentation
52
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS52 Key Benefits of IS Rejection Memo & Correspondence process improvements due to: Enforcement of RAM rules (RM stage and correspondence) Opportunity to detect duplicate rejections of the same original billing All rejections and correspondence link to previous billings; information and supporting documents do not have to be re-uploaded Time-limit reduction possibilities for Rejection Memos and Correspondence Risk management and process improvements due to: Fewer items outstanding for a shorter period of time Future potential time-limit reduction for prime / original billings Benefits to the environment due to reduction of paper and shipping Alliance objectives complemented by SIS
53
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS53 Airline Changes (where applicable) Change from IDEC to IS-IDEC 500 bytes instead of 160 bytes Follow rules in RAM Some detail records mandatory (e.g. taxes) Other elements mandatory (e.g. Source Code) Choose and implement other submission formats (IS-XML, IS-WEB) Prepare to scan and upload supporting documents Implement e-billing (possible legal implications)
54
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS54 Next Steps
55
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS55 Next Steps This Week Breakout Sessions Back at Your Office Airline Business Case (on the SIS website) IS Participation Guide (see the breakout session) Internal Planning and Budgeting (based on the IS Participation Guide and the Migration breakout session)
56
ATH – 27/28 Oct 2009SIS P3 – ICHUG09 – Intro to SIS56 Thank you. Email: sis@iata.org SIS Website: www.iata.org/sis www.iata.org/sis
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.