Download presentation
Presentation is loading. Please wait.
Published byMoris Peters Modified over 9 years ago
1
® Network Distribution Center (NDC) Update Frank Neri Manager, Processing Operations
2
2 MTAC Meeting – May 20, 2010 Agenda Update on Activation Service Performance L009/L011 consolidation STC Integration
3
3 MTAC Meeting – May 20, 2010 Update on Activation Phase 1 Phase 2 Phase 3 Phase 4 5/18 – 7/17 3 NDCs Complete 8/10 – 9/11 6 NDCs Complete 9/14 – 10/9 5 NDCs Complete 10/19 – 11/20 7 NDCs X 4 Mar 26 3 NDCs Activation completed Decision to Accelerate Implementation Retirement Incentive & Peak Season Approaching Areas Own Network Activation
4
4 MTAC Meeting – May 20, 2010 NDC Update End-to-End Package Services ● Performance now at goal - 15-20% improvement compared to pre-NDC activation Periodicals and Standard Mail ● Focus network wide on L201 flow (First Class surface reach) ● Operating windows modified to move L009/L010/L011 volumes though NDC facilities in less than 24 hours ● IMB will provide additional visibility ● DMM changes will enhance mail flow and reduce cycle time
5
5 MTAC Meeting – May 20, 2010 NDC Update Consolidation of MXD States distribution 75% complete ● MXD States consolidation began 4/5/10 Mailers transition through 6/17/10 Eliminated 34 L011 sites and 15 L009 sites OTSIS monitoring compliance Des Moines L011 on 6/7/10 (75 days for compliance) Los Angeles and New Jersey TBD ● 18 Letter and Flat sites when consolidation is completed
6
6 MTAC Meeting – May 20, 2010 NDC Update Combine STC and NDC operations in the NDC facility ● Washington NDC complete ● Chicago will be complete 6/5/10 ● Others to be completed in FY2010 Atlanta HSTS installation under way Memphis HSTS complete Springfield campus optimization Los Angeles equipment moves under way New Jersey equipment moves under way
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.