Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 Annie BAGLIN, CNRS, Observatoire de Paris, 2005, CW9 AP Short runs in the Anticentre Phase B till March 30th Priorities among AP None yet in the centre……

Similar presentations


Presentation on theme: "1 Annie BAGLIN, CNRS, Observatoire de Paris, 2005, CW9 AP Short runs in the Anticentre Phase B till March 30th Priorities among AP None yet in the centre……"— Presentation transcript:

1 1 Annie BAGLIN, CNRS, Observatoire de Paris, 2005, CW9 AP Short runs in the Anticentre Phase B till March 30th Priorities among AP None yet in the centre……

2 2 Annie BAGLIN, CNRS, Observatoire de Paris, 2005, CW9 HD 46375 Quite poor and unknown…. HD 46558 Prim Targ. Cand. HD 46597 7.3 G5III HD 46303 7.6 F5V HD 46748 7.98 A2V HD 42641 5,83 K0V HD 46149 7.59 O8.5V HD 46150 6.75 O6 HD 46223 7.27 O5 HD 46202 8.19 O9V HD 46485 8.26 O8 HD 46612 6.88 M0III Hipp var HD 46006 7.87 G7III HD 46375 7.84 K1IV HD 46179 6.69 B9V HD 45910 6.76 Be HD 46105 7.13 A1p HD 46424 6.98 G5V

3 3 Annie BAGLIN, CNRS, Observatoire de Paris, 2005, CW9 AP targets in the field of HD 46375 AP-EXO Table

4 4 Annie BAGLIN, CNRS, Observatoire de Paris, 2005, CW9 NGC 2264

5 5 Annie BAGLIN, CNRS, Observatoire de Paris, 2005, CW9 NGC 2264 Seismo field  Dor

6 6 Annie BAGLIN, CNRS, Observatoire de Paris, 2005, CW9 AP in the field of NGC 2264 ST Mon Mira 11.4 IS Mon Algol 12 FX Mon Mira 12.8 F6 Hipp var F6 10.5…..g or sg?

7 7 Annie BAGLIN, CNRS, Observatoire de Paris, 2005, CW9 SdB: KPD 0716+0258 Very poor field for seismology KPD 0716+0258

8 8 Annie BAGLIN, CNRS, Observatoire de Paris, 2005, CW9 SDB KPD 0629-0016 Ap KPD 0629-0016 Quite interesting for seismology  Ceph Ap but 9.5

9 9 Annie BAGLIN, CNRS, Observatoire de Paris, 2005, CW9 Observation scheduling Change in planning: launch October 15th --> Creation of Initial runs (AB) Decision on initial runs -the prefered fields (MD) possible sismo pointings (EM) Targets of LRc1 and LRa1 In the sismo field (EM) In the exo field (MD) For the Aps (WW) Planning for decisions on short runs APs End of phase B march 31st, priorities Sismo exploratory programme (EM)

10 10 Annie BAGLIN, CNRS, Observatoire de Paris, 2005, CW9 A New Strategy for the first semester --> Initial runs for sismo and exo 2 or 3 45 days runs, at least 2 and a back up Anticentre Preferably in the regions where exo data exist To be decided early April Launch July 06 First rotation oct 06 Instr. tests 1 st Short run IR2 IR3 ? IR1 Launch Sun Earth orbit


Download ppt "1 Annie BAGLIN, CNRS, Observatoire de Paris, 2005, CW9 AP Short runs in the Anticentre Phase B till March 30th Priorities among AP None yet in the centre……"

Similar presentations


Ads by Google