Download presentation
Presentation is loading. Please wait.
Published byJessica Stafford Modified over 8 years ago
1
Inaccurate Cycle Billing Records in OMD - Northeast Black Belt: Jim Palmer Division: Northeast BU – Forecasting/Service/ Revenue/Base/Type of Machine
2
2 Background – Current Process n We are looking at just the Northeast Region as this is last on the Oracle rollout schedule n This will allow sufficient benefit dollars even though the process will move into Oracle. n Soft benefit from cleaner data conversion into Oracle. n Cycle billing process has recently been centralized into Glastonbury CCC. n Present project scope does not include meter read estimation. n Scope does include all pricing and product codes. n Many original Maintenance Contracts documents remain in the Marketplace locations. n Approximately 170,000 MIF under contract
3
3 Project Charter n PROBLEM STATEMENT: Inaccuracies in the Northeast Region Cycle Billing records result in lost revenue and impact IKON’s ability to forecast future revenue. These inaccuracies could include over-billing and under-billing of customers. n PROJECT OBJECTIVE: Correct the Base and Overage rates and other product coding in the Cycle billing records and insure the use of coding that is appropriate for equipment type and segment.
4
4 Project Charter n PROJECT BENEFITS: Based on a prior review completed in the Connecticut marketplace there is a 2% to 5% error rate in existing billings. The Northeast Region has approximately $200mm in Aftermarket revenue. 70%, $140mm, is billed to the customer by IOSC. The remaining $60mm is billed directly by the Region. A 1% positive improvement in billing rates could result in $2 million in increased revenue. n PROJECT METRIC “Y”: Accurate pricing and coding leading to increased revenue and improved customer service. n DEFECT DEFINITION: Inaccurate pricing and coding in cycle records.
5
5 Project Team n Project Champions n Rich Silverstein Operations n Vic Rainsford Finance n Process Leader n Tim O’Donnell Existing Cycle Billing Manager – (only 3 wks more) n Tom Magel New Cycle Billing Manager n Subject Matter Expert Diana Cyr n Team members n Carol Cross IT n Tina Rothschild former Mid Atlantic CB Supervisor n Master Black Belt Arthur Girard n Financial Analyst Dave Peters
6
6 First Steps… Project Charter Scope Review Determine how much revenue from the Northeast is covered by Cycle Billing - Completed. Review any previous samplings or audits completed to validate estimated number of and dollar value of errors. Determine if this info can be used to validate potential benefits in terms of dollars for the entire region. Initial Meetings - Completed Meeting with former Process Supervisor from Phila Mktplace. Meeting with Regional Process Leader(s) Meeting with prospective project team to obtain high level process overview. Develop 1 st Draft of SIPOC with Team Members
7
7 First Draft of SIPOC
8
8 Next Steps…Start the Define Phase Dive deeper into mapping existing process Next meeting in Glastonbury scheduled for week of Oct 20. Meet with Core team Meet with people one level below SME. The actual Worker Bee’s. Identify CTS’s Begin investigation of location of source data Find original Maintenance contracts in marketplaces used for initial data entry. Determine type and location of source data documentation for other data entry and updates.
9
9 Project DMAIC Checklist/Status Problem Statement: Inaccuracies in the Northeast Region Cycle Billing records result in lost revenue and impacts IKON’s ability to forecast future revenue
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.