Download presentation
Presentation is loading. Please wait.
Published byMyron Gilbert Modified over 8 years ago
1
POLITECNICO DI TORINO Authors: A. Sanna, S. Spriano, L. Zichella Date: January 2014 M6 meeting 15 th -16 th January 2014 FoF.NMP.2013-8-608771
2
Who we are Centre of teaching and research, and one of the most important universities in Europe for engineering and architecture studies, strongly committed to collaboration with industry FoF.NMP.2013-8-608771 2 M6 meeting 15 th -16 th January 2014
3
Who we are: some numbers FoF.NMP.2013-8-608771 3 M6 meeting 15 th -16 th January 2014 32.000 students 11 departments 839 academic staff 60 educational programs 24 PhD programs > 30 specialization Masters > 5000 international students 400 international cooperation agreements 10.704 internships update a.y. 2012/2013 284 mill. Euros of budget 2013
4
Who we are: 3 departments involved DAUIN - Department of Control and Computer Engineering Main involvements: wp1 and wp3 DISAT - Department of Applied Science and Technology Main involvements: wp1 and wp6 DIATI - Department of Environment, Land and Infrastructure Engineering Main involvements: wp1 and wp6 FoF.NMP.2013-8-608771 4 M6 meeting 15 th -16 th January 2014
5
What we expect from the project: DAUIN Gathering user requirements for the AR-based platform (T1.1) Defining guidelines for implementing the AR-based platform (T1.5) Implementing the AR-based platform (T3.3 – task leader) Supporting the demonstrator #4 (T6.4) FoF.NMP.2013-8-608771 5 M6 meeting 15 th -16 th January 2014
6
What we expect from the project: DISAT Review of end-user requirements (T1.1) Life data collection and analysis (concerning the use of diamond wires in stone cutting machines) (T1.2) Life-cycle costing prediction and assessment (focusing on materials) (T1.4) Design for Environment (DfE) procedures (focusing on materials) (T1.5) Supporting the demonstrator #4 (T6.4) FoF.NMP.2013-8-608771 6 M6 meeting 15 th -16 th January 2014
7
What we expect from the project: DIATI Analyzing stone materials in their interaction with the cutting system (T1.1) Collecting the data during the stone cutting (T1.2) Assessing operating conditions (T1.4) Guidelines for the best use of the cutting system (T1.5) Supporting the demonstrator #4 (T6.4) FoF.NMP.2013-8-608771 7 M6 meeting 15 th -16 th January 2014
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.