Download presentation
Presentation is loading. Please wait.
Published byRobyn Franklin Modified over 9 years ago
1
G UIDELINE R EVISIONS – R ELEASE 1-25-11 February 1, 2011 Regional Technical Forum Presented by: Michael Baker
2
1. Scope and Purpose Custom Protocols are further defined Program Impact Evaluation added as a fourth type of savings estimation method Key Terms section moved here from Section 2 so that it can serve the whole document Regional R&D recognized as an important source of measures 2 2/1/2010
3
2. Deemed Unit Energy Savings (UES) Eligibility combined with Measure Identifiers Consensus opinion allowed for less important input parameters “Value Basis” removed from reliability standard Addition of a checklist to assist in completing measure proposals New stage added for “Small Savers”. Expert opinion provided on these by RTF but no approved UES values. 3 2/1/2010
4
2. Deemed (continued) Pilot stage modified to include expert opinion on preliminary estimates of UES, but no approved values. Many minor clarifications 4 2/1/2010
5
3. S TANDARD P ROTOCOLS FOR S ITE -S PECIFIC S AVINGS ESTIMATES Minor clarifications 5 2/1/2010
6
4. Custom Protocol for Site-Specific Savings Estimates Three sub-sections added to define this method Required Knowledge and Skills of Practitioner Site-Specific Savings Estimation Plan Site-Specific Savings Report Measure Description Measure Commissioning Data Collection Sampling Procedure Savings Estimation Cost Effectiveness Analysis 6 2/1/2010
7
5. Program Impact Evaluation Two sub-sections define this method Impact Evaluation Types and Standards Claim Verification Delivery Verification Statistical Analyses of Utility Metering Engineering Savings Estimation Regional Collaboration Impact Evaluation Protocol Pilots and Provisional Data Collection Regional Program Impacts Tracking Progress Against Regional Power Plan 7 2/1/2010
8
6. Integration Among Savings Estimation Methods New section to highlight opportunities integration among the four methods Impact Evaluation of Deemed Measures Impact Evaluation of Standard Protocol Measures Creation and Updates of Deemed Savings Creation of Standard Protocols 8 2/1/2010
9
Appendices New checklist supports development of deemed measures Placeholder removed for custom protocols template. Guidance on this protocol provided in Section 4 9 2/1/2010
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.