Download presentation
Presentation is loading. Please wait.
Published byWilliam Powell Modified over 8 years ago
1
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS High School Building Project
2
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS Site and Building Issues No control point for visitor’s access to the high school. No control point for students entering or leaving the high school. No visible front entrance. Vehicular traffic crosses student traffic between classes. Existing parking areas are not well defined.
3
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS P R O G R A M A N A L Y S I S
4
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS Main Building: Brick work and window replacement needed. Water infiltration needs to be addressed. Domestic water piping needs replacement. Interior finishes, doors and casework needs replacement. Existing mechanical service does not provide adequate heating and cooling. Existing electrical distribution system does not provide for the technology needs. Science rooms plumbing is inadequate. Health life safety items for egress need to be addressed.
5
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS MAIN BUILDING Life Expectancy – Masonry & Windows Masonry on the 95 year old building is needing tuck-pointing, replacement of stone caps and sills and parapet rebuilt. Windows replacement is needed.
6
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS MAIN BUILDING Most restrooms and science lab do not meet ADA requirements Mechanical and Plumbing piping systems are 95 years old and need replacement. Life Expectancy – Heating & Plumbing
7
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS MAIN BUILDING Fin tube heating does not evenly heat rooms Life Expectancy – Heating Exposed heating piping in corridors is within reach of students.
8
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS MAIN BUILDING Water penetration has caused major damage to interior walls throughout the building. Lower level shows signs of moisture ands water penetration due to the age of the building. Life Expectancy – Structure
9
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS MAIN BUILDING Doors are not fire rated and hardware is not ADA compliant Assembly areas are not ADA compliant. Guardrails do not meet current code. Flooding occurs during heavy rains Codes & Safety
10
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS MAIN BUILDING Exterior fire escape is not covered or enclosed and creates a hazard in inclement weather. It does not meet current codes. Handrails do not meet current International Building Code (IBC) requirements. Stairs do not comply with fire codes. Codes & Safety
11
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS MAIN BUILDING Corridors do not comply with current fire codes. Codes & Safety
12
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS MAIN BUILDING The windows have outlived their useful life and are not energy efficient. Wooden floor structural system has settled on second and third floors as shown by large gaps at baseboards. Energy ConservationCodes & Safety
13
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS MAIN BUILDING Heating System piping is 95 years old. Controls are obsolete and ineffective. Window air conditioners do not meet current fresh air requirements. They are inefficient, and do not adequately cool the rooms. Energy Conservation
14
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS MAIN BUILDING Instructional Issues 70% of the classrooms are under sized to handle new technologies and teaching methods. Science Labs labs are 30% smaller than standard labs. – Other Science classes taught in small classrooms, without student lab stations.
15
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS MAIN BUILDING Instructional Issues Secure Entry Point - No security vestibule controlling access to HS buildings. - Administration Office not at entry / cannot control or supervise visitors gaining access to High School.
16
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS MAIN BUILDING Instructional Issues Old Gym: – 45% under size for an auxiliary gym – Space is underutilized (used about 10% of the time) – Lack of adequate space causes busing of students to remote facilities
17
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS Cafeteria Building: Exterior window system needs replacing. Existing mechanical service does not provide adequate heating and cooling. Existing electrical distribution system does not provide for the technology needs. Domestic water piping needs replacement. Health life safety items need to be addressed. Chair lift needs replaced with elevator.
18
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS CAFETERIA BUILDING Life Expectancy – Windows Windows replacement is needed.
19
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS CAFETERIA BUILDING Life Expectancy – Mechanical & Structural Cooling, heating, exhaust & plumbing issues need to be addressed. Structural items need to be addressed.
20
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS CAFETERIA BUILDING Interior and exterior stairs do not meet current IBC codes for railings. Asbestos floor tiles need to be replaced. Codes & Safety
21
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS CAFETERIA BUILDING Exterior cooler/freezers need to be in the building or covered. Exhaust under open stairs on exterior violates codes. This stair violates several codes. Codes & Safety
22
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS Gymnasium Building: The window needs replacement on the 1939 and 1967 portion of the building. Some of the mechanical systems serving the 1939 and 1967 portion of the building need upgrading. Technology labs are inadequately powered and sized, needing relocated. Domestic water piping needs replacement in the 1939 building.
23
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS GYMNASIUM BUILDING Current Gym is used for P.E., athletic practices, games, Operetta practices, performances, as well as Band/Choral performances. More space is needed for these activities. –Stage and gym is inadequate as a performing arts venue; acoustically inappropriate Locker rooms are below grade with poor air circulation and ADA concerns Band Room not ADA accessible Instructional Issues
24
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS Agriculture Building: Shop building's unit heaters, water heater, exhaust fans and air conditioner needs replacing. Health life safety items need to be addressed. Domestic water piping needs replacing. AGRICULTURE BUILDING
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.