Presentation is loading. Please wait.

Presentation is loading. Please wait.

Oil & Gas Conservation Getting a Well Drilled Eric R. King September 1, 2011.

Similar presentations


Presentation on theme: "Oil & Gas Conservation Getting a Well Drilled Eric R. King September 1, 2011."— Presentation transcript:

1 Oil & Gas Conservation Getting a Well Drilled Eric R. King September 1, 2011

2 Intent to Drill OAC Form 1000

3

4 Geologic Mapping Structure Net Isopach Map

5 Geological exhibit structure and isopach map

6 Isopach map

7 Bonded Operator Requirements: Operator’s Agreement – OAC 165:10-1-10 Category “A” Surety Category “B” Surety Financial Statement as Surety – OAC 165:10-1-11

8 Corporate Surety Bond – OAC 165:10-1-12 Irrevocable Commercial Letter of Credit – OAC 165-10-1-13 Cashier’s Check, Certificate of Deposit etc. – OAC 165-10-1-14

9 Completing a Well

10 Completion Report OAC Form 1002A

11 Initial One Point Test OAC Form 1016

12 Annual One Point Test OAC Form 1017

13 Eric R. King One Leadership Square, 15 th Floor 211 N. Robinson Ave. Oklahoma City, OK 73102 (405) 235-5518


Download ppt "Oil & Gas Conservation Getting a Well Drilled Eric R. King September 1, 2011."

Similar presentations


Ads by Google