1 Recent Updates Stony Brook Crew. 2 Maintenance Week Cryo Gate Valve –Dirt-like black substance on Valve—cleaned –Repair Successful; no more leaks. Rebuilt.

Similar presentations


Presentation on theme: "1 Recent Updates Stony Brook Crew. 2 Maintenance Week Cryo Gate Valve –Dirt-like black substance on Valve—cleaned –Repair Successful; no more leaks. Rebuilt."— Presentation transcript:

1 1 Recent Updates Stony Brook Crew

2 2 Maintenance Week Cryo Gate Valve –Dirt-like black substance on Valve—cleaned –Repair Successful; no more leaks. Rebuilt Scroll pump installed and working. Original Scroll Pump Opened: –Bad bearings. –Bad seals. –Replacement parts ordered. Welded over “too large” hole in test box.

3 3 Clean Room Survey Laminar Table Better than Class 1Laminar Table Better than Class 1 Foyer could be better (improve seal to main tent) Dirty spot in the back (Air Conditioner filters!!!) FoyerLaminar Table ??? Outside

4 4 Pump Test on Panels Nothing Happened…

5 5 Teaching Schedule Changed Hemmick’s teaching load will drop: –Last week 6 Lectures + 1 Recitation –This week 0 Lectures + 1 Recitation This condition lasts for the next 6 weeks. Drees teaches main lecture until mid April.

6 6 Shot 5 Modified INFN box to hold single prototype- sized GEM. Shot went normally. Good QE from local system. Next shot: –One chicklet. –One small GEM –Both go to Bob for accurate QE measure. Expect Gain Test Box Running This Week. –Complete Test Cycle except for Glove Box!!