Withlacoochee Regional Water Supply Authority Water Supply Plan Update #7 October 15 – November 15.

Similar presentations


Presentation on theme: "Withlacoochee Regional Water Supply Authority Water Supply Plan Update #7 October 15 – November 15."— Presentation transcript:

1 Withlacoochee Regional Water Supply Authority Water Supply Plan Update #7 October 15 – November 15

2 Presentation Topics  Determining the Availability of Groundwater for Water Supply through 2035.

3 Public Supply Demand Projections (2010-2035) County 2010 Water Use (mgd) Increase in Demand from 2010-2035 (mgd) Citrus16.95.5 Hernando22.16.0 Marion37.516.7 Sumter22.914.2 TOTALS99.4 42.4

4 Evaluation of Potential Wellfields Evaluation of Potential Wellfield Locations Wellfields Proposed for the 2010 Water Supply Plan

5 Evaluation of Potential Wellfields Evaluation of Potential Wellfield Locations Locations of MFL Springs

6 Evaluation of Potential Wellfields Evaluation of Potential Wellfield Locations Locations of MFL Springs and Lakes

7 Presentation Topics  Reassess proposed well field locations from the 2010 Water Supply Plan ─Determine which public water supply systems will have deficits in 2035 ─Meet with county and city utilities ─Revise potential well field locations ─Determine potential well field production

8 Hernando County – 2035 Water Supply Deficit

9 Citrus County – 2035 Water Supply Deficit

10 Evaluation of Potential Wellfields Evaluation of Potential Wellfield Locations Wellfields Proposed for the 2010 Water Supply Plan

11 Sumter County – 2035 Water Supply Deficit

12 Evaluation of Potential Wellfields Evaluation of Potential Wellfield Locations Wellfields Proposed for the 2010 Water Supply Plan

13 Marion County - 2035 Water Supply Deficit (SWFWMD Portion)

14 Marion County – 2035 Water Supply Deficit (SJRWMD Portion)

15 Evaluation of Potential Wellfields Evaluation of Potential Wellfield Locations Wellfields Proposed for the 2010 Water Supply Plan

16 Determining the Availability of Groundwater for Water Supply through 2035  Once wellfield locations have been determined, groundwater availability will be determined through the use of the SWFWMD’s Northern District Model. –The production of the wellfields will be input into the model to determine how water resources such as wetlands, lakes, springs, and rivers in the vicinity of the wellfields will be impacted


Download ppt "Withlacoochee Regional Water Supply Authority Water Supply Plan Update #7 October 15 – November 15."