6.12a DESIGN APPROACH ON BILILO SPATE IRRIGATION PROJECT Presented by Eyob Yehayis.

Similar presentations


Presentation on theme: "6.12a DESIGN APPROACH ON BILILO SPATE IRRIGATION PROJECT Presented by Eyob Yehayis."— Presentation transcript:

1 6.12a DESIGN APPROACH ON BILILO SPATE IRRIGATION PROJECT Presented by Eyob Yehayis

2

3 1. Project Area Description Bililo spate is located at 42.75 N and 9.233E  The average altitude is 1450 m.  The annual mean rain fall is 757.15 mm.  The annual effective RF=579.4mm  T max=31.6 and T min=15.6 o c  The Annual mean ETo=1902.77mm

4 1. Project Area Description Continued…  The cropping season starts in 15 th march dominantly they produce sorghum.  The crop water required during the cropping season 579.14 mm.  The total effective rainfall during the cropping season is 338 mm.  Irrigation required = CWR-ERF = 259.69 mm

5 1. Project Area Description Continued…  The watershed Area is 157 km 2 of which above 70% of it is covered by forest and scattered bushes, the rest is farmland.  About 25% of the cathment has a slope>28 %  The Project is almost it is a newly designed spate irrigation scheme.

6 2 The basic assumptions used for the project.  The system should be easy for farmers to operate and not require the large inputs of labor or other resources to maintain.  The system should prevent large and uncontrolled flood flows from damaging canals and field systems.  The system should Continue to function with high rates of sedimentation on the fields and canal beds.

7 3 Structural Component of The System 4.1 Weir (Diversion Head work) 4.2 Canal and Canal Structures

8 3.1 Weir (Diversion Head work)  The head work is modified to discharge the excess flood that is expected to come in 50 year return period.  Accordingly, the maximum flood for 50 years Return period is 110 3 /s.  Designed to provides the required head to command the Farmland.  The intake canal sill level is 0.3 m above under sluice level.

9 3.2 Canal and Canal Structures 3.2.1 Flood Canal (Main canal) The design canal capacity is determined by the following assumptions:  The recession flood stays for 5 days  The farm land is provided with 25 cm flood water on one irrigation.  Farm land have chance of getting 2 flood water irrigation during the growing season.  The resulting design capacity is 3 m 3 /s for 500ha.

10 4.2. Flood Canal cont’ed…  The canal cross section and bed slope is designed on the maximum permissible velocity which satisfy 60% design flow to avoid the silt deposition on canal bed at lower flow.  Some of the canal cross section which passes porous and cliff formation is lined with masonry.  The secondary canal capacity is designed by proportioning the hectare it develops and multiplying by flood duration day ( 5 days).

11 4.2.1 Flood Canal cont’ed… Generally The System has: -Earthen canal on main canal 5 km on secondary canal 10.5km, 11 in number -Lined canal on main canal 2.3 km

12 4.2.2 Canal Structures  The system is provided with different farm structures which satisfies the hydraulic performance and structural stability depending on the land topography.  Accordingly, on the main canal there are:  4 vertical drops  32 inclined drops 7 of which on secondary canal  1 flume  5 division box  4 chute 2 of which on SC1  3 Road crossing culverts

13 5 Water Management  It is assumed that only 1/5 of the command area is irrigated in one day starting from upstream toward the down stream. This could be changed based on the community interest.

14 6 Problem encountered  Estimating the frequency, amount and duration of the flood water in un gauged rivers.  Estimating the sediment yield with the respective runoff.

15 Head Work

16 Downstream face of Weir

17 Downstream of Headwork

18 Flood water entering the canal

19 Rejection spillway

20 Lined canal

21 Canal running along the cliff

22 Flume upstream

23 Division box with drop

24

25 Secondary canal under construction

26 Recession flow

27 Canal Silting


Download ppt "6.12a DESIGN APPROACH ON BILILO SPATE IRRIGATION PROJECT Presented by Eyob Yehayis."