1 Preparation and Positioning of Korea for the ITER Project 2004 KSTAR US-Korea Workshop May 19-20, General Atomics.

Similar presentations


Presentation on theme: "1 Preparation and Positioning of Korea for the ITER Project 2004 KSTAR US-Korea Workshop May 19-20, General Atomics."— Presentation transcript:

1 1 Preparation and Positioning of Korea for the ITER Project 2004 KSTAR US-Korea Workshop May 19-20, General Atomics

2 2 Korean Participation in ITER Initiated from 2002 IAEA bilateral meeting with EU, US Letter of Intent sent to ITER Parties in 2002 November ITER Legal/Technical Experts visit to Korea in April, May 2003 Approval from Korean National ST Council to join ITER Negotiation Letter of Firm Intent sent in May 2003 Joined ITER Negotiation from June 2003 as a full partner

3 3 ITER Procurement Item for Korea packagekIUAKO sharing TF conductor21520% Main vessel123.720% Equat. port24.5 67% Upper port22.1 Lower port29.75 Blanket FW8720% Assembly tool22100% Thermal shield28.8100% Tritium storage14.588% AC/DC converters 82.265% Daignostics137.53.3%

4 4 KO Procurement Preparation In 2004, - Comply with ITA as much as possible - Technical survey and search for qualified industries - Preliminary technical R&D for each procurement item for its cost estimation and for its manufacturing process In 2005, - Selection process of qualified industries start - contract procedure start

5 5 KO Procurement Preparation In 2004, - Before ITER Joint Implementation Agreement - Operate Task Force Team as a temporary Domestic Agency(DA) - Possibly establishing DA at the end of 2004 In 2005, - Full establishment of KO-DA - Operate DA with ITER Field Team

6 6 Role of KO-Domestic Agency ITA work and further R&D work for ITER procurement ITER Liaison work GOV Funding distribution to KO industries via k-FITA QA/QC, and Export control of ITER procurement with ITER Field Team

7 7 KO-DA Work Plan Korean GOV Domestic Agency(DA) ITER Org. Korean Industry k-FITA Korean Fusion Community Foreign Industry

8 8 k-FITA Organization Korea Fusion Industry and Technology Association established in 2003 August Consists of - Industries participated in KSTAR project - Korean nuclear industries - Korean universities and research laboratories participated in KSTAR project

9 9 k-FITA participating Korean Industries Doosan, Hyundai, KISWIRE, POSCON, KOPEC, SFA, Wonshin etc. participated in KSTAR project Korea Nuclear-Hydro Co.(KHNP), Korea Electricity Co.(KEPCO) plus subsidized nuclear industries

10 10 k-FITA Work and Plan for ITER Organizing preliminary technical workshop for the participating Korean industries(3 times) including Korean nuclear industries Industrial procurement preparation for Korean ITER procurement package in close cooperation with Korean fusion community, DA, and foreign industries

11 11 KSTAR as ITER Pilot Plant Base work for KO participation to ITER Test bed for ITER operation and preparation work for ITER modification and upgrade - in heating and current drive - in diagnostics - in plasma and machine control

12 12 Organizational Work for KSTAR as ITER Pilot Plant Bilateral cooperation meeting with JA in April 2004; experts from JAERI, NIFS Bilateral cooperation meeting with EU in May 2004; experts from EFDA, CEA, IPP, ENEA Planned one with RF and CN Proposal : Bilateral meeting with US